← Back to Patent Explorer
US3135249A Expired / Lapsed US ⏱️ 0.0 years remaining

Recirculation system and method for vapor generator

Assignee: Combustion Engineering Inc
•
Filing: 1961-07-27
•
Granted: 1964-06-02
•
Expires: 1981-07-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Wilburt W Schroedter
  • 👤 Jr Edward L Kochey

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 02:03
CPC Classifications
F; F22; F22B; F22B29/00; F22B29/02; F22B29/023; F22B29/026; F22B35/00; F22B35/06; F22B35/10; F22B35/12; F22B35/125

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 149 words
IN A MODIFIED ONCE-THROUGH FLOW VAPOR GENERATOR OPERATING AT, BELOW AND ABOVE A PREDETERMINED LOAD POINT, AND HAVING A FURNACE FOR PRODUCING HOT COMBUSTION GASES, THE METHOD OF PROVIDING STRAIGHT-THROUGH FLOW OF THE WORKING FLUID THROUGH A CONTINUOUS PATH OF SAID FLUID INCLUDING SEVERAL HEATING SECTIONS, WHEN OPERATING THE VAPOR GENERATOR ABOVE SAID PREDETERMINED LOAD POINT, AND IN ADDITION, PROVIDING RECIRCULATED FLUID FLOW AROUND A SECOND HEATING SECTION OF SAID PATH WHEN OPERATING BELOW SAID PREDETERMINED LOAD POINT, SAID SECOND HEATING SECTION HAVING A FLUID FLOW RESISTANCE DIRECTLY VARYING WITH LOAD, THE STEPS COMPRISING: FORCING A STREAM OF WORKING FLUID THROUGH A FIRST SECTION OF SAID PATH IN HEAT ABSORBING RELATION WITH SAID GASES TO ESTABLISH A FIRST FLUID PRESSURE AT THE OUTLET END OF SAID FIRST SECTION; THEREAFTER WHILE OPERATING WITHIN A LOWER LOAD RANGE AND UP TO SAID PREDETERMINED LOAD POINT FORCING SAID HEATED FLUID THROUGH A
Claim 2
Dependent Claim 149 words
IN A MODIFIED ONCE-THROUGH FLOW VAPOR GENERATOR OPERATING AT, BELOW AND ABOVE A PREDETERMINED LOAD POINT, AND HAVING A FURNACE FOR PRODUCING HOT COMBUSTION GASES, THE METHOD OF PROVIDING STRAIGHT-THROUGH FLOW OF THE WORKING FLUID THROUGH A CONTINUOUS PATH OF SAID FLUID INCLUDING SEVERAL HEATING SECTIONS, WHEN OPERATING THE VAPOR GENERATOR ABOVE SAID PREDETERMINED LOAD POINT, AND IN ADDITION, PROVIDING RECIRCULATED FLUID FLOW AROUND A SECOND HEATING SECTION OF SAID PATH WHEN OPERATING BELOW SAID PREDETERMINED LOAD POINT, SAID SECOND HEATING SECTION HAVING A FLUID FLOW RESISTANCE DIRECTLY VARYING WITH LOAD, THE STEPS COMPRISING: FORCING A STREAM OF WORKING FLUID THROUGH A FIRST SECTION OF SAID PATH IN HEAT ABSORBING RELATION WITH SAID GASES TO ESTABLISH A FIRST FLUID PRESSURE AT THE OUTLET END OF SAID FIRST SECTION; THEREAFTER WHILE OPERATING WITHIN A LOWER LOAD RANGE AND UP TO SAID PREDETERMINED LOAD POINT FORCING SAID HEATED FLUID THROUGH A

References Cited (Backward Citations)

US1707920A Cited
GB509746A Cited
GB831175A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1967-06-02 1967-12-02 1968-06-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1971-06-02 1971-12-02 1972-06-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1975-06-02 1975-12-02 1976-06-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag