Earth pile anchorage
Assignee: Intrusion Prepakt Inc
•
Filing: 1958-04-03
•
Granted: 1963-12-17
•
Expires: 1978-04-03
Abstract
No abstract record available.
Inventors
- 👤 Jr Roscoe C Jennings
- 👤 John C King
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-03 10:00
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/22; E02D5/54
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
167 words
AN EARTH PILE ANCHORAGE WHEREIN THE EARTH IS COMPRISED OF A LAYER OF BED-ROCK AND AN OVERBURDEN OF SOIL, A CONCRETE STRUCTURE IN SAID OVERBURDEN AND BEARING AGAINST SAID BED-ROCK, SAID CONCRETE STRUCTURE HAVING AN EXTERNAL SURFACE PROVIDED WITH RANDOMLY ARRANGED OUTWARDLY EXTENDING PROTRUSIONS WHICH KEY INTO SAID OVERBURDEN, A LOAD ABSORBING ROD EXTENDING FROM SAID STRUCTURE INTO SAID BED-ROCK, MEANS RIGIDLY FASTENING SAID LOAD ABSORBING ROD TO SAID BED-ROCK, MEANS RIGIDLY FASTENING SAID LOAD ABSORBING ROD TO SAID CONCRETE STRUCTURE AT A POINT SUBSTANTIALLY SPACED ABOVE THE POINT OF FASTENING TO SAID BED-ROCK, SAID LATTER RIGID FASTENING MEANS TRANSMITTING FORCES FROM SAID LOAD ABSORBING ROD TO SAID CONCRETE STRUCTURE IN BOTH THE UPWARD AND DOWNWARD DIRECTIONS, SAID LOAD ABSORBING ROD BEING FREE FROM RESTRAINING MOVEMENT BETWEEN SAID POINTS AND IN A DIRECTION TOWARD EACH OF SAID POINTS WHEREBY SAID LOAD ABSORBING ROD MAY ELONGATE UNDER UPLIFT FORCES TO ENABLE THE CONCRETE STRUCTURE TO MOVE UPWARDLY AND TRANSMIT A PORTION OF THE UPLIFT FORCES TO SAID OVERBURDEN.
Claim 2
Dependent Claim
167 words
AN EARTH PILE ANCHORAGE WHEREIN THE EARTH IS COMPRISED OF A LAYER OF BED-ROCK AND AN OVERBURDEN OF SOIL, A CONCRETE STRUCTURE IN SAID OVERBURDEN AND BEARING AGAINST SAID BED-ROCK, SAID CONCRETE STRUCTURE HAVING AN EXTERNAL SURFACE PROVIDED WITH RANDOMLY ARRANGED OUTWARDLY EXTENDING PROTRUSIONS WHICH KEY INTO SAID OVERBURDEN, A LOAD ABSORBING ROD EXTENDING FROM SAID STRUCTURE INTO SAID BED-ROCK, MEANS RIGIDLY FASTENING SAID LOAD ABSORBING ROD TO SAID BED-ROCK, MEANS RIGIDLY FASTENING SAID LOAD ABSORBING ROD TO SAID CONCRETE STRUCTURE AT A POINT SUBSTANTIALLY SPACED ABOVE THE POINT OF FASTENING TO SAID BED-ROCK, SAID LATTER RIGID FASTENING MEANS TRANSMITTING FORCES FROM SAID LOAD ABSORBING ROD TO SAID CONCRETE STRUCTURE IN BOTH THE UPWARD AND DOWNWARD DIRECTIONS, SAID LOAD ABSORBING ROD BEING FREE FROM RESTRAINING MOVEMENT BETWEEN SAID POINTS AND IN A DIRECTION TOWARD EACH OF SAID POINTS WHEREBY SAID LOAD ABSORBING ROD MAY ELONGATE UNDER UPLIFT FORCES TO ENABLE THE CONCRETE STRUCTURE TO MOVE UPWARDLY AND TRANSMIT A PORTION OF THE UPLIFT FORCES TO SAID OVERBURDEN.
References Cited (Backward Citations)
DE267656C
Cited
US813966A
Cited
US1449236A
Cited
US1609260A
Cited
US1647925A
Cited
US1798468A
Cited
US2063142A
Cited
US2187677A
Cited
US2335433A
Cited
US2332990A
Cited
US2428070A
Cited
US2507259A
Cited
US2528999A
Cited
US2512831A
Cited
US2554896A
Cited
US2558529A
Cited
GB669661A
Cited
US2690074A
Cited
US2741910A
Cited
US2875584A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1966-12-16 | 1967-06-17 | 1967-12-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1970-12-16 | 1971-06-17 | 1971-12-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1974-12-16 | 1975-06-17 | 1975-12-17 | $7700.00 | Window Closed / Lapsed |