← Back to Patent Explorer
US3097492A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of forming concrete piles in situ

Assignee: —
•
Filing: —
•
Granted: 1963-07-16
•
Expires: 1980-07-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

No inventors recorded.

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 16:53
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/22; E02D5/34; E02D5/36; E02D15/00; E02D15/02; E02D15/04

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 148 words
METHOD OF FORMING CONCRETE PILES IN SITU COMPRISING THE STEPS OF: DRILLING A HOLE IN SANDY SOIL TO A PREDETERMINED FRACTION OF THE ULTIMATE PILE DEPTH AND REMOVING THE SOIL THEREFROM THIS HOLE CONSTITUTING A MIXING AREA; ADDING HYDRAULICALLY SETTABLE CEMENTITIOUS MATERIAL TO THE HOLE TO FORM A FLUID CONCRETE MIX WITH THE UNDERLYING SOIL; DRILLING TO A SLIDABLY LOWER DEPTH INTO THE UNDERLYING SOIL BY MEANS OF A ROTATING AUGER AND RAISING THE NEWLY DRILLED SOIL UPWARDLY AND MIXING THE NEWLY DRILLED SOIL WITH THE CEMENTITIOUS MATERIAL THEREABOVE BY RAISING THE ROTATING AUGER INTO THE MIXING AREA; REPEATING SAID DRILLING, RAISING AND MIXING STEPS IN A PROGRESSIVE OPERATION UNTIL THE PREDETERMINED DEPTH OF THE PILE IS REACHED, WHEREBY THE NEWLY DRILLED SOIL AND THE CEMENTITIOUS MATERIAL ARE UNIFORMLY MIXED THROUGHOUT THE ENTIRE DEPTH BY THE ROTATING AUGER, AND THEN REMOVING THE AUGER FROM THE FORMED CONCRETE PILE.
Claim 2
Dependent Claim 148 words
METHOD OF FORMING CONCRETE PILES IN SITU COMPRISING THE STEPS OF: DRILLING A HOLE IN SANDY SOIL TO A PREDETERMINED FRACTION OF THE ULTIMATE PILE DEPTH AND REMOVING THE SOIL THEREFROM THIS HOLE CONSTITUTING A MIXING AREA; ADDING HYDRAULICALLY SETTABLE CEMENTITIOUS MATERIAL TO THE HOLE TO FORM A FLUID CONCRETE MIX WITH THE UNDERLYING SOIL; DRILLING TO A SLIDABLY LOWER DEPTH INTO THE UNDERLYING SOIL BY MEANS OF A ROTATING AUGER AND RAISING THE NEWLY DRILLED SOIL UPWARDLY AND MIXING THE NEWLY DRILLED SOIL WITH THE CEMENTITIOUS MATERIAL THEREABOVE BY RAISING THE ROTATING AUGER INTO THE MIXING AREA; REPEATING SAID DRILLING, RAISING AND MIXING STEPS IN A PROGRESSIVE OPERATION UNTIL THE PREDETERMINED DEPTH OF THE PILE IS REACHED, WHEREBY THE NEWLY DRILLED SOIL AND THE CEMENTITIOUS MATERIAL ARE UNIFORMLY MIXED THROUGHOUT THE ENTIRE DEPTH BY THE ROTATING AUGER, AND THEN REMOVING THE AUGER FROM THE FORMED CONCRETE PILE.

References Cited (Backward Citations)

US935081A Cited
US1189108A Cited
GB237929A Cited
US2048710A Cited
US2326045A Cited
US2729067A Cited
US2781605A Cited
US3023585A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1966-07-15 1967-01-14 1967-07-16 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1970-07-15 1971-01-14 1971-07-16 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1974-07-15 1975-01-14 1975-07-16 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag