US3089795A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method for producing fiber texture and cube-texture sheets of iron-base alloys
Assignee: Westinghouse Electric Corp
•
Filing: 1959-11-18
•
Granted: 1963-05-14
•
Expires: 1979-11-18
Abstract
No abstract record available.
Inventors
- 👤 Hu Hsun
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 22:33
CPC Classifications
C; C21; C21D; C21D8/00; C21D8/12; C21D8/1216; C21D8/1233; C21D8/1244; C21D8/1255; C21D8/1266; C21D8/1272
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
262 words
A PROCESS FOR PRODUCING CUBE TEXTURE IRON-BASE SHEET MATERIAL FOR MAGNETIC PURPOSES FROM HOT-ROLLED PLATE HAVING A RECRYSTALLIZED STRUCTURE AND ESSENTIALLY RANDOM GRAIN ORIENTATION, COMPRISING THE STEPS OF, (1) COLD ROLLING THE PLATE FROM 40% TO 80% TO FROM SHEET MATERIAL, (2) ANNEALING THE REDUCED SHEET IN A WET HYDROGEN ATMOSPHERE AT A TEMPERATURE OF FROM 700*C. TO 1000*C. FOR FROM ABOUT 1 TO 5 HOURS TO PROVIDE RECRYSTALLIZATION AND DECARBURIZATION, (3) ANNEALING THE RECRYSTALLIZED SHEET AT A TEMPERATURE OF FROM 1100*C. TO 1300:C. FOR FROM 6 TO 48 HOURS IN DRY HYDROGEN, THE ABOVE STEPS YIELDING A SHEET MATERIAL HAVING A (001) FIBER TEXTURE WITH THE ROLLING DIRECTION AS THE FIBER AXIS, (4) COLD ROLLING THE FIBER TEXTURE SHEET TO EFFECT A REDUCTION OF FROM 40% TO 80%, (5) ANNEALING THE MATERIAL AT A TEMPERATURE IN THE RANGE FROM 400*C. TO 600*C. FOR FROM ABOUT 4 TO 48 HOURS TO OBTAIN PARTIAL PRIMARY RECRYSTALLIZATION, (6) COMPLETING THE ANNEALING OF THE SHEET MATERIAL AT TEMPERATURES IN THE RANGE FROM 700*C. TO 100*C. FOR A PERIOD OF FROM ABOUT 1/2 TO 12 HOURS TO OBTAIN SUBSTANTIALLY COMPLETE PRIMARY RECRYSTALLIZATION, AND (7) REPEATING STEPS 4, 5 AND 6, AT LEAST ONCE IN THE ORDER SET FORTH TO PRODUCE A FINE-GRAINED SHEET MATERIAL HAVING AT LEAST 40% CUBE GRAINS, THE IRON-BASE SHEET MATERIAL COMPRISING AT LEAST ONE ELEMENT SELECTED FROM THE GROUP CONSISTING OF SILICON, ALUMINUM, AND MOLYBDENUM, THE SILICON NOT EXCEEDING 6%, THE ALUMINUM NOT EXCEEDING 8%, AND THE MOLYBEDNUM NOT EXCEEDING 5%, AND THE BALANCE BEING IRON WITH SMALL AMOUNTS OF INCIDENT IMPURITIES.
Claim 2
Dependent Claim
262 words
A PROCESS FOR PRODUCING CUBE TEXTURE IRON-BASE SHEET MATERIAL FOR MAGNETIC PURPOSES FROM HOT-ROLLED PLATE HAVING A RECRYSTALLIZED STRUCTURE AND ESSENTIALLY RANDOM GRAIN ORIENTATION, COMPRISING THE STEPS OF, (1) COLD ROLLING THE PLATE FROM 40% TO 80% TO FROM SHEET MATERIAL, (2) ANNEALING THE REDUCED SHEET IN A WET HYDROGEN ATMOSPHERE AT A TEMPERATURE OF FROM 700*C. TO 1000*C. FOR FROM ABOUT 1 TO 5 HOURS TO PROVIDE RECRYSTALLIZATION AND DECARBURIZATION, (3) ANNEALING THE RECRYSTALLIZED SHEET AT A TEMPERATURE OF FROM 1100*C. TO 1300:C. FOR FROM 6 TO 48 HOURS IN DRY HYDROGEN, THE ABOVE STEPS YIELDING A SHEET MATERIAL HAVING A (001) FIBER TEXTURE WITH THE ROLLING DIRECTION AS THE FIBER AXIS, (4) COLD ROLLING THE FIBER TEXTURE SHEET TO EFFECT A REDUCTION OF FROM 40% TO 80%, (5) ANNEALING THE MATERIAL AT A TEMPERATURE IN THE RANGE FROM 400*C. TO 600*C. FOR FROM ABOUT 4 TO 48 HOURS TO OBTAIN PARTIAL PRIMARY RECRYSTALLIZATION, (6) COMPLETING THE ANNEALING OF THE SHEET MATERIAL AT TEMPERATURES IN THE RANGE FROM 700*C. TO 100*C. FOR A PERIOD OF FROM ABOUT 1/2 TO 12 HOURS TO OBTAIN SUBSTANTIALLY COMPLETE PRIMARY RECRYSTALLIZATION, AND (7) REPEATING STEPS 4, 5 AND 6, AT LEAST ONCE IN THE ORDER SET FORTH TO PRODUCE A FINE-GRAINED SHEET MATERIAL HAVING AT LEAST 40% CUBE GRAINS, THE IRON-BASE SHEET MATERIAL COMPRISING AT LEAST ONE ELEMENT SELECTED FROM THE GROUP CONSISTING OF SILICON, ALUMINUM, AND MOLYBDENUM, THE SILICON NOT EXCEEDING 6%, THE ALUMINUM NOT EXCEEDING 8%, AND THE MOLYBEDNUM NOT EXCEEDING 5%, AND THE BALANCE BEING IRON WITH SMALL AMOUNTS OF INCIDENT IMPURITIES.
References Cited (Backward Citations)
US2053162A
Cited
US2473156A
Cited
US2582382A
Cited
DE1009214B
Cited
US2867559A
Cited
US2875114A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1966-05-13 | 1966-11-12 | 1967-05-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1970-05-13 | 1970-11-12 | 1971-05-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1974-05-13 | 1974-11-12 | 1975-05-14 | $7700.00 | Window Closed / Lapsed |