← Back to Patent Explorer
US2997426A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for continuous production of coke and heat

Assignee: Individual
•
Filing: 1959-11-02
•
Granted: 1961-08-22
•
Expires: 1979-11-02
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Mansfield Vaughn

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 12:31
CPC Classifications
C; C10; C10B; C10B49/00; C10B49/02; C10B49/04

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 159 words
IN A METHOD OF PRODUCING HEAT AND COKE FROM GREEN PLASTICISABLE COKING COAL, INCLUDING THE STEPS OF PREHEATING THE COAL UNTIL SUBSTANTIALLY ALL MOISTURE IS DRIVEN THEREFROM AND THE COAL IS DRY; PASSING A HOMOGENEOUS BED OF THE DRIED PREHEATED COAL IN A HORIZONTAL PATH THROUGH A COKING OVEN HAVING A FURNACE MOUTH OVER PART OF THE BED PATH; AND IGNITING PART OF THE BED AS IT ENTERS THE OVEN: THE IMPROVEMENTS WHICH COMPRISE THE STEPS OF ZONE FEEDING HOT PRIMARY AIR UPWARDLY THROUGH THE BED FROM AN INITIAL ZONAL REGION BENEATH THE BED AT THE START OF THE PATH IN AMOUNTS SUFFICIENT TO COMPLETELY IGNITE THE BED BUT INSUFFICIENT TO COMBUST WITH A SUBSTANTIAL PORTION OF THE VOLATILES LIBERATED FROM THE COAL THEREABOVE; SIMULTANEOUSLY ZONE FEEDING HOT PRIMARY AIR UPWARDLY THROUGH THE BED FROM SUCCEEDING ZONAL REGIONS DISPOSED BENEATH THE BED PROGRESSIVELY AWAY FROM THE INITIAL ZONAL REGION AND TOWARDS THE END OF THE PATH IN SUCCESSIVELY DECREAS-
Claim 2
Dependent Claim 159 words
IN A METHOD OF PRODUCING HEAT AND COKE FROM GREEN PLASTICISABLE COKING COAL, INCLUDING THE STEPS OF PREHEATING THE COAL UNTIL SUBSTANTIALLY ALL MOISTURE IS DRIVEN THEREFROM AND THE COAL IS DRY; PASSING A HOMOGENEOUS BED OF THE DRIED PREHEATED COAL IN A HORIZONTAL PATH THROUGH A COKING OVEN HAVING A FURNACE MOUTH OVER PART OF THE BED PATH; AND IGNITING PART OF THE BED AS IT ENTERS THE OVEN: THE IMPROVEMENTS WHICH COMPRISE THE STEPS OF ZONE FEEDING HOT PRIMARY AIR UPWARDLY THROUGH THE BED FROM AN INITIAL ZONAL REGION BENEATH THE BED AT THE START OF THE PATH IN AMOUNTS SUFFICIENT TO COMPLETELY IGNITE THE BED BUT INSUFFICIENT TO COMBUST WITH A SUBSTANTIAL PORTION OF THE VOLATILES LIBERATED FROM THE COAL THEREABOVE; SIMULTANEOUSLY ZONE FEEDING HOT PRIMARY AIR UPWARDLY THROUGH THE BED FROM SUCCEEDING ZONAL REGIONS DISPOSED BENEATH THE BED PROGRESSIVELY AWAY FROM THE INITIAL ZONAL REGION AND TOWARDS THE END OF THE PATH IN SUCCESSIVELY DECREAS-

References Cited (Backward Citations)

US1839741A Cited
US1591023A Cited
FR655257A Cited
US1918162A Cited
US2209255A Cited
US2179080A Cited
US2347076A Cited
US2380930A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1964-08-21 1965-02-20 1965-08-22 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1968-08-21 1969-02-20 1969-08-22 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1972-08-21 1973-02-20 1973-08-22 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag