← Back to Patent Explorer
US2968600A Expired / Lapsed US ⏱️ 0.0 years remaining

Control for a boiling type reactor supplying a steam turbine

Assignee: Allis Chalmers Corp
•
Filing: 1955-03-11
•
Granted: 1961-01-17
•
Expires: 1975-03-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Robert C Allen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 21:39
CPC Classifications
G; G21; G21D; G21D3/00; G21D3/08; G21D3/12; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 218 words
IN A POWER PLANT INCLUDING A STEAM TURBINE SUPPLYING POWER TO A VARIABLE LOAD AT A SUBSTANTIALLY CONSTANT PREDETERMINED SPEED, A BOILING TYPE REACTOR FOR GENERATING STEAM TO OPERATE SAID TURBINE AND MEANS FOR CONDUCTING STEAM FROM SAID REACTOR TO SAID TURBINE, A CONTROL SYSTEM COMPRISING: A FIRST VALVE ASSEMBLY FOR CONTROLLING ADMISSION OF STEAM TO SAID TURBINE, A SECOND VALVE ASSEMBLY FOR CONTROLLING PRESSURE WITHIN SAID REACTOR, AND A GOVERNOR RESPONSIVE TO THE SPEED OF SAID TURBINE, SAID GOVERNOR BEING CONNECTED TO SAID FIRST AND SECOND VALVE ASSEMBLIES, SAID GOVERNOR BEING OPERATIVE IN RESPONSE TO TURBINE SPEED GREATER THAN SAID PREDETERMINED SPEED TO ADJUST SAID FIRST VALVE ASSEMBLY TO REDUCE THE FLOW OF STEAM TO SAID TURBINE AND TO ADJUST SAID SECOND VALVE ASSEMBLY TO DECREASE PRESSURE WITHIN SAID REACTOR TO REDUCE HEAT OUTPUT OF SAID REACTOR, AND SAID GOVERNOR BEING VICE VERSA OPERATIVE IN RESPONSE TO TURBINE SPEED LESS THAN SAID PREDETERMINED SPEED TO ADJUST SAID FIRST VALVE ASSEMBLY TO INCREASE THE STEAM FLOW TO SAID TURBINE AND TO ADJUST SAID SECOND VALVE ASSEMBLY TO INCREASE PRESSURE WITHIN SAID REACTOR TO INCREASE HEAT OUTPUT OF SAID REACTOR TO THEREBY OPERATE SAID TURBINE AT SAID PREDETERMINED SPEED AND MATCH THE HEAT OUTPUT OF SAID REACTOR TO THE VARIABLE HEAT INPUT REQUIREMENTS OF SAID TURBINE FOR VARIABLE LOADS.
Claim 2
Dependent Claim 218 words
IN A POWER PLANT INCLUDING A STEAM TURBINE SUPPLYING POWER TO A VARIABLE LOAD AT A SUBSTANTIALLY CONSTANT PREDETERMINED SPEED, A BOILING TYPE REACTOR FOR GENERATING STEAM TO OPERATE SAID TURBINE AND MEANS FOR CONDUCTING STEAM FROM SAID REACTOR TO SAID TURBINE, A CONTROL SYSTEM COMPRISING: A FIRST VALVE ASSEMBLY FOR CONTROLLING ADMISSION OF STEAM TO SAID TURBINE, A SECOND VALVE ASSEMBLY FOR CONTROLLING PRESSURE WITHIN SAID REACTOR, AND A GOVERNOR RESPONSIVE TO THE SPEED OF SAID TURBINE, SAID GOVERNOR BEING CONNECTED TO SAID FIRST AND SECOND VALVE ASSEMBLIES, SAID GOVERNOR BEING OPERATIVE IN RESPONSE TO TURBINE SPEED GREATER THAN SAID PREDETERMINED SPEED TO ADJUST SAID FIRST VALVE ASSEMBLY TO REDUCE THE FLOW OF STEAM TO SAID TURBINE AND TO ADJUST SAID SECOND VALVE ASSEMBLY TO DECREASE PRESSURE WITHIN SAID REACTOR TO REDUCE HEAT OUTPUT OF SAID REACTOR, AND SAID GOVERNOR BEING VICE VERSA OPERATIVE IN RESPONSE TO TURBINE SPEED LESS THAN SAID PREDETERMINED SPEED TO ADJUST SAID FIRST VALVE ASSEMBLY TO INCREASE THE STEAM FLOW TO SAID TURBINE AND TO ADJUST SAID SECOND VALVE ASSEMBLY TO INCREASE PRESSURE WITHIN SAID REACTOR TO INCREASE HEAT OUTPUT OF SAID REACTOR TO THEREBY OPERATE SAID TURBINE AT SAID PREDETERMINED SPEED AND MATCH THE HEAT OUTPUT OF SAID REACTOR TO THE VARIABLE HEAT INPUT REQUIREMENTS OF SAID TURBINE FOR VARIABLE LOADS.

References Cited (Backward Citations)

US2204139A Cited
US2520568A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1964-01-17 1964-07-18 1965-01-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1968-01-17 1968-07-18 1969-01-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1972-01-17 1972-07-18 1973-01-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag