← Back to Patent Explorer
US2928779A Expired / Lapsed US ⏱️ 0.0 years remaining

Neutronic reactor construction and operation

Assignee: Individual
•
Filing: 1954-08-16
•
Granted: 1960-03-15
•
Expires: 1974-08-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jordan T Weills
  • 👤 John M West

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 05:03
CPC Classifications
G; G21; G21D; G21D5/00; G21D5/04; G21D5/08; G21C; G21C15/00; G21C15/02; G21C15/04; G21C15/06; G21C7/00; G21C7/02; G21C7/32; Y; Y02; Y02E; Y02E30/00; Y02E30/30; Y10; Y10S; Y10S376/00; Y10S376/908

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 122 words
THE METHOD OF OPERATING A NEUTRONIC REACTOR WITH A NEGATIVE TEMPERATURE COEFFICENT OF REACTIVITY COMPRISING THE STEPS OF SEQUENTIALLY MAINTAINING A NEUTRONIC CHAIN REACTION IN THE REACTOR TO ESTABLISH AN EQUILIBRIUM XENON CONCENTRATION, SHUTTING DOWN THE REACTOR FOR A PERIOD FO TIME LESS THAN 72 HOURS, LOWERING THE TEMPERATURE OF THE REACTOR DURING THE PERIOD OF SHUTDOWN BY AN AMOUNT SUFFCIENT FOR THE NEGATIVE TEMPERATURE COEFFICIENT OF REACTIVITY TO INCREASE THE REACTIVITY OF THE REACTOR EQUAL TO THE DECREASE IN REACTIVITY DUE TO THE PEAK XENON CONCENTRATION, GENERATING A NEUTRON FLUX WITHIN THE REACTOR EQUAL TO THE FLUX BEFORE SHUTDOWN, AND INCREASING THE TEMPERATURE OF THE REACTOR OVER A PERIOD OF TIME IN ACCORDANCE WITH THE CURVE SET FORTH IN FIGURE 13
Claim 2
Independent Claim 122 words
THE METHOD OF OPERATING A NEUTRONIC REACTOR WITH A NEGATIVE TEMPERATURE COEFFICENT OF REACTIVITY COMPRISING THE STEPS OF SEQUENTIALLY MAINTAINING A NEUTRONIC CHAIN REACTION IN THE REACTOR TO ESTABLISH AN EQUILIBRIUM XENON CONCENTRATION, SHUTTING DOWN THE REACTOR FOR A PERIOD FO TIME LESS THAN 72 HOURS, LOWERING THE TEMPERATURE OF THE REACTOR DURING THE PERIOD OF SHUTDOWN BY AN AMOUNT SUFFCIENT FOR THE NEGATIVE TEMPERATURE COEFFICIENT OF REACTIVITY TO INCREASE THE REACTIVITY OF THE REACTOR EQUAL TO THE DECREASE IN REACTIVITY DUE TO THE PEAK XENON CONCENTRATION, GENERATING A NEUTRON FLUX WITHIN THE REACTOR EQUAL TO THE FLUX BEFORE SHUTDOWN, AND INCREASING THE TEMPERATURE OF THE REACTOR OVER A PERIOD OF TIME IN ACCORDANCE WITH THE CURVE SET FORTH IN FIGURE 13

References Cited (Backward Citations)

US2708656A Cited
US2768134A Cited
US2736696A Cited
US2743224A Cited
US2770591A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1963-03-15 1963-09-14 1964-03-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1967-03-15 1967-09-14 1968-03-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1971-03-15 1971-09-14 1972-03-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag