US2922281A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Underground storage of hydrocarbons
Assignee: Sunoco Inc
•
Filing: 1954-07-15
•
Granted: 1960-01-26
•
Expires: 1974-07-15
Abstract
No abstract record available.
Inventors
- 👤 Charles H Brooks
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 16:52
CPC Classifications
B; B65; B65G; B65G5/00
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
155 words
IN THE STORAGE OF HYDROCARBONS OVER BRINE IN A PLURALITY OF UNDERGROUND SALT CAVITIES WTHEREIN THE HYDROCARBONS ARE PUMPED THEREIN AT RELATIVELY HIGH PRESSURE TO DISPLACE BRINE AND SUBSQUENTLY ARE REMOVED THEREFROM BY RETURNING BRINE TO THE CAVITIES, THE PROCESS WHICH COMPRISES CONTINUOUSLY SUPPLYING, FROM A BRINE STORAGE SOURCE, BRINE RELATIVELY LOW PRESSURE INTO A MANIFOLD COMMUNICATING WITH EACH OF SAID CAVITIES TROUGH A CONDUIT EXTENDING TO A LOWER PART THEREOF, AND CYCLING BRINE FROM SAID MANIFOLD TO SAID BRINE STORAGE SOURCE WHEN THE PRESSURE IN SAID MANIFOLD EXCEEDS THE BRINE SUPPLY PRESSURE, WHEREBY HYDROCARONS MAY BE PUMPED INDEPENDENTLY TO THE CAVITIES AS INDIVIDUAL STREAMS RESULTING IN A CORRESPONDING DISPLACEMENT OF BRINE FROM THE CAVITIES INTO SAID MANIFOLD AND WHEREBY HYDROCARBONS MAY BE INDEPENDENTLY DISPLACED FROM SAID CAVITIES BY BRINE FED FROM SAID MANIFOLD WHILE UTILIZING AS THE MOTIVATING FORCES FOR SUCH DISPLACEMENT THE WEIGHT OF THE COLUMN OF BRINE IN EACH OF SAID CONDUITS.
Claim 2
Dependent Claim
155 words
IN THE STORAGE OF HYDROCARBONS OVER BRINE IN A PLURALITY OF UNDERGROUND SALT CAVITIES WTHEREIN THE HYDROCARBONS ARE PUMPED THEREIN AT RELATIVELY HIGH PRESSURE TO DISPLACE BRINE AND SUBSQUENTLY ARE REMOVED THEREFROM BY RETURNING BRINE TO THE CAVITIES, THE PROCESS WHICH COMPRISES CONTINUOUSLY SUPPLYING, FROM A BRINE STORAGE SOURCE, BRINE RELATIVELY LOW PRESSURE INTO A MANIFOLD COMMUNICATING WITH EACH OF SAID CAVITIES TROUGH A CONDUIT EXTENDING TO A LOWER PART THEREOF, AND CYCLING BRINE FROM SAID MANIFOLD TO SAID BRINE STORAGE SOURCE WHEN THE PRESSURE IN SAID MANIFOLD EXCEEDS THE BRINE SUPPLY PRESSURE, WHEREBY HYDROCARONS MAY BE PUMPED INDEPENDENTLY TO THE CAVITIES AS INDIVIDUAL STREAMS RESULTING IN A CORRESPONDING DISPLACEMENT OF BRINE FROM THE CAVITIES INTO SAID MANIFOLD AND WHEREBY HYDROCARBONS MAY BE INDEPENDENTLY DISPLACED FROM SAID CAVITIES BY BRINE FED FROM SAID MANIFOLD WHILE UTILIZING AS THE MOTIVATING FORCES FOR SUCH DISPLACEMENT THE WEIGHT OF THE COLUMN OF BRINE IN EACH OF SAID CONDUITS.
References Cited (Backward Citations)
US744694A
Cited
US762601A
Cited
US916130A
Cited
US2351503A
Cited
US2661062A
Cited
US2803114A
Cited
US2772564A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1963-01-25 | 1963-07-27 | 1964-01-26 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1967-01-25 | 1967-07-27 | 1968-01-26 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1971-01-25 | 1971-07-27 | 1972-01-26 | $7700.00 | Window Closed / Lapsed |