← Back to Patent Explorer
US2902425A Expired / Lapsed US ⏱️ 0.0 years remaining

Art of cooling and moderating neutronic reactors

Assignee: Individual
•
Filing: 1956-06-07
•
Granted: 1959-09-01
•
Expires: 1976-06-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Kosmin Milton
  • 👤 Mcewen Malcolm

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 16:35
CPC Classifications
G; G21; G21C; G21C5/00; G21C5/12; G21C5/123; G21D; G21D5/00; G21D5/04; G21D5/08; Y; Y02; Y02E; Y02E30/00; Y02E30/30; Y10; Y10S; Y10S376/00; Y10S376/90; Y10S376/904; Y10S376/905

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 36 words
A NEUTRONIC POWER REACTOR IN WHICH THE NEUTRON MODERATOR IS A HYDROCARBON MATERIAL SELECTED FROM THE GROUP CONSISTING OF ISOPROPYLIPHENYL AND MIXTURES OF ISOPROPYLBIPHENYL AND BIPHENYL, WHICH MIXTURES CONTAIN AT LEAST 80% BY WEIGHT OF ISOPROPYLBIPHENYL.
Claim 2
Dependent Claim 36 words
A NEUTRONIC POWER REACTOR IN WHICH THE NEUTRON MODERATOR IS A HYDROCARBON MATERIAL SELECTED FROM THE GROUP CONSISTING OF ISOPROPYLIPHENYL AND MIXTURES OF ISOPROPYLBIPHENYL AND BIPHENYL, WHICH MIXTURES CONTAIN AT LEAST 80% BY WEIGHT OF ISOPROPYLBIPHENYL.

References Cited (Backward Citations)

US2364719A Cited
US2482904A Cited
US2708656A Cited
US2556128A Cited
US2736696A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1962-08-31 1963-03-02 1963-09-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1966-08-31 1967-03-02 1967-09-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1970-08-31 1971-03-02 1971-09-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag