← Back to Patent Explorer
US2901043A Expired / Lapsed US ⏱️ 0.0 years remaining

Heavy oil recovery

Assignee: Pan American Petroleum Corp
•
Filing: 1955-07-29
•
Granted: 1959-08-25
•
Expires: 1975-07-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Frank E Campion
  • 👤 Eugene D Glass
  • 👤 Richard A Morse

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 00:25
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 177 words
IN A METHOD OF RECOVERING A HIGH VISCOSITY OIL FROM AN UNDERGROUND PRODUCING FORMATION IN WHICH IT OCCURS WHEREIN HEAT IS GENERATED BY COMBUSTION WITHIN SAID PRODUCING FORMATION, THE IMPROVEMENT WHICH COMPRISES THE STEPS OF DRILLING AT LEAST TWO SPACED WELLS INTO SAID FORMATION, ONE OF SAIDD WELLS BEING AN INPUT WELL AND THE OTHER OF SAID WELLS BEING AN OUTPUT WELL; INITIALLY PROVIDING AT LEAST ONE GENERALLY HORIZONTAL FRACTURE EXTENDING CONFINUOUSLY THROUGH SAID FORMATION BETWEEN SAID WELLS, SAID FRACTURE HAVING A GAS FLOW CAPACITY WHICH IS LARGE COMPARED TO THE GAS FLOW CAPACITY OF SAID FORMATION WITHOUT SAID FRACTURE; THEREAFTER INITIATING COMBUSTION AT THE DEPTH OF SAID FORMATION WITHIN THE BORE OF SAID OUTPUT WELL; INJECTING A COOL COMBUSTION-SUPPORTING GAS THROUGH SAID INPUT WELL TO FLOW PRIMARILY THROUGH SAID FRACTURE TO SUPPORT SAID COMBUSTION AND TO PROPAGATE A ZONE OF COMBUSTION CHIEFLY ALONG SAID FRACTURE BACK TOWARD SAID INPUT WELL; CONTROLLING THE COMPOSITION AND INJECTION RATE OF SAID COMBUSTION-SUPPORTING GAS SO THAT THE EQUIVALENT OF AT LEAST ABOUT 0.4 CUBIC FOOT OF A STOICHIOMETRIC MIXTURE OF
Claim 2
Dependent Claim 177 words
IN A METHOD OF RECOVERING A HIGH VISCOSITY OIL FROM AN UNDERGROUND PRODUCING FORMATION IN WHICH IT OCCURS WHEREIN HEAT IS GENERATED BY COMBUSTION WITHIN SAID PRODUCING FORMATION, THE IMPROVEMENT WHICH COMPRISES THE STEPS OF DRILLING AT LEAST TWO SPACED WELLS INTO SAID FORMATION, ONE OF SAIDD WELLS BEING AN INPUT WELL AND THE OTHER OF SAID WELLS BEING AN OUTPUT WELL; INITIALLY PROVIDING AT LEAST ONE GENERALLY HORIZONTAL FRACTURE EXTENDING CONFINUOUSLY THROUGH SAID FORMATION BETWEEN SAID WELLS, SAID FRACTURE HAVING A GAS FLOW CAPACITY WHICH IS LARGE COMPARED TO THE GAS FLOW CAPACITY OF SAID FORMATION WITHOUT SAID FRACTURE; THEREAFTER INITIATING COMBUSTION AT THE DEPTH OF SAID FORMATION WITHIN THE BORE OF SAID OUTPUT WELL; INJECTING A COOL COMBUSTION-SUPPORTING GAS THROUGH SAID INPUT WELL TO FLOW PRIMARILY THROUGH SAID FRACTURE TO SUPPORT SAID COMBUSTION AND TO PROPAGATE A ZONE OF COMBUSTION CHIEFLY ALONG SAID FRACTURE BACK TOWARD SAID INPUT WELL; CONTROLLING THE COMPOSITION AND INJECTION RATE OF SAID COMBUSTION-SUPPORTING GAS SO THAT THE EQUIVALENT OF AT LEAST ABOUT 0.4 CUBIC FOOT OF A STOICHIOMETRIC MIXTURE OF

References Cited (Backward Citations)

US1494735A Cited
US2497868A Cited
US2584606A Cited
US2630307A Cited
US2693854A Cited
US2780449A Cited
US2754911A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1962-08-24 1963-02-23 1963-08-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1966-08-24 1967-02-23 1967-08-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1970-08-24 1971-02-23 1971-08-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag