← Back to Patent Explorer
US2897132A Expired / Lapsed US ⏱️ 0.0 years remaining

Thermal reforming of a catalytic reformate

Assignee: BP PLC
•
Filing: 1956-11-15
•
Granted: 1959-07-28
•
Expires: 1976-11-15
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Knight Warren Nevin Norton

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 19:55
CPC Classifications
C; C10; C10G; C10G59/00; C10G59/02; C10G59/04; C10L; C10L1/00; C10L1/04; C10L1/06

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 94 words
A PROCESS FOR PRODUCING GASOLINE OF INCREASED OCTANE NUMBER FROM A LIQUID CATALYTIC REFORMATE, WHICH REFORMATE IS A PRODUCT OF A HYDROFORMING PROCESS WHICH IS USED A PLATINUM-CONTAINING CATALYST, COMPRISING SEPARATING THE CATALYTIC REFORMATE INTO A HIGH BOILING LIQUID FRACTION AND A LOW BOILING LIQUID FRACTION, THERMALLY REFORMING TWO FRACTIONS SEPARATELY, EACH AT A TEMPERATURE WITHIN THE RANGE 1000* TO 1200*F. AND A PRESSURE WITHIN THE RANGE 200 TO 1200 P.S.I.G., BUT AT DIFFERENT SEVERITIES, THE LOW BOILING FRACTION BEING REFORMED AT THE GREATER SEVERITY, AND BLENDING THE PRODUCTS OF THE THERMAL REFORMING OPERATIONS.
Claim 2
Dependent Claim 94 words
A PROCESS FOR PRODUCING GASOLINE OF INCREASED OCTANE NUMBER FROM A LIQUID CATALYTIC REFORMATE, WHICH REFORMATE IS A PRODUCT OF A HYDROFORMING PROCESS WHICH IS USED A PLATINUM-CONTAINING CATALYST, COMPRISING SEPARATING THE CATALYTIC REFORMATE INTO A HIGH BOILING LIQUID FRACTION AND A LOW BOILING LIQUID FRACTION, THERMALLY REFORMING TWO FRACTIONS SEPARATELY, EACH AT A TEMPERATURE WITHIN THE RANGE 1000* TO 1200*F. AND A PRESSURE WITHIN THE RANGE 200 TO 1200 P.S.I.G., BUT AT DIFFERENT SEVERITIES, THE LOW BOILING FRACTION BEING REFORMED AT THE GREATER SEVERITY, AND BLENDING THE PRODUCTS OF THE THERMAL REFORMING OPERATIONS.

References Cited (Backward Citations)

US2249461A Cited
US2490287A Cited
US2659692A Cited
US2740751A Cited
US2773809A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1962-07-27 1963-01-26 1963-07-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1966-07-27 1967-01-26 1967-07-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1970-07-27 1971-01-26 1971-07-28 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag