US2895859A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for the manufacture of piston rings
Assignee: Renault SA
•
Filing: 1955-06-30
•
Granted: 1959-07-21
•
Expires: 1975-06-30
Abstract
No abstract record available.
Inventors
- 👤 Peras Lucien
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-09 21:27
CPC Classifications
C; C22; C22C; C22C37/00; C22C37/04
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
164 words
THE PROCESS OF MAKING ALLOYED CAST PISTON RINGS WHICH ARE SUBSTANTIALLY FREE OF PRIMARY CEMENTITE AND STACK MOLDING IN A GREEN SAND MOLD THE PISTON RINGS OF A CAST IRON HAVING THE COMPOSITION 3.00-4.00% CARBON 1.50-3.10%SILICON,0.6-15% MANGANESE, 0.8-2.0%COPPER, 0.05-0.70% PHHOSPHOURS,2.02-0.15% SULPHUR,AND THE BALANCE SUBSTANTAILLY ALL IRON WHEREBY THE CAST PISTON RING HAVE A WHITE STRUCTURE HEATING TO A TEMPERATURE SLIGHTLY ABOVE THAT OF THE EUTECTOID TANSFORMATION POINT SO THAT AUSTENITIZATION TAKES PLACE AND FOR A TIME SUFFICIENT FOR ALL THE CARBON TO BE DISSOLVED QUENCHING WHILE MAINTAINING A SUBSTANSTIALLY MARTENSITIC STRUCTURE AGAIN HEATING AT A CONSTANT TEMPERATURE BETWEEN 420*C.AND 550*C. FOR A PERIOD OF THE ORDER OF THREE HOUR TO BRING FORTH GRAPHITE NUCLEATION INCREASING THE TEMPERATURE AFTER SAID NUCLEATION HEATING TO A TEMPERATURE TURE HIGHER THAN THE EUTECTOID TRANSFORMATION POINT FOR A PERIOD OF TIME SUFFICENT TO GRAPHITZE THE CARBON IN THE PRIMARY CEMENTITE COOLING AT A CONTROLLED RATE SAID COOLING RATE BEING TEMPERING AT A PREDETERMINED TEMPERATURE TO INSURE A PREDETERMINED HARDNESS.
Claim 2
Dependent Claim
164 words
THE PROCESS OF MAKING ALLOYED CAST PISTON RINGS WHICH ARE SUBSTANTIALLY FREE OF PRIMARY CEMENTITE AND STACK MOLDING IN A GREEN SAND MOLD THE PISTON RINGS OF A CAST IRON HAVING THE COMPOSITION 3.00-4.00% CARBON 1.50-3.10%SILICON,0.6-15% MANGANESE, 0.8-2.0%COPPER, 0.05-0.70% PHHOSPHOURS,2.02-0.15% SULPHUR,AND THE BALANCE SUBSTANTAILLY ALL IRON WHEREBY THE CAST PISTON RING HAVE A WHITE STRUCTURE HEATING TO A TEMPERATURE SLIGHTLY ABOVE THAT OF THE EUTECTOID TANSFORMATION POINT SO THAT AUSTENITIZATION TAKES PLACE AND FOR A TIME SUFFICIENT FOR ALL THE CARBON TO BE DISSOLVED QUENCHING WHILE MAINTAINING A SUBSTANSTIALLY MARTENSITIC STRUCTURE AGAIN HEATING AT A CONSTANT TEMPERATURE BETWEEN 420*C.AND 550*C. FOR A PERIOD OF THE ORDER OF THREE HOUR TO BRING FORTH GRAPHITE NUCLEATION INCREASING THE TEMPERATURE AFTER SAID NUCLEATION HEATING TO A TEMPERATURE TURE HIGHER THAN THE EUTECTOID TRANSFORMATION POINT FOR A PERIOD OF TIME SUFFICENT TO GRAPHITZE THE CARBON IN THE PRIMARY CEMENTITE COOLING AT A CONTROLLED RATE SAID COOLING RATE BEING TEMPERING AT A PREDETERMINED TEMPERATURE TO INSURE A PREDETERMINED HARDNESS.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1962-07-20 | 1963-01-19 | 1963-07-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1966-07-20 | 1967-01-19 | 1967-07-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1970-07-20 | 1971-01-19 | 1971-07-21 | $7700.00 | Window Closed / Lapsed |