← Back to Patent Explorer
US2887159A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of shutting off water in petroleum wells

Assignee: Dow Chemical Co
•
Filing: 1955-11-16
•
Granted: 1959-05-19
•
Expires: 1975-11-16
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 William B Harley
  • 👤 James A Harmon
  • 👤 Sutherlin Jack

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 14:40
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/50; C09K8/502

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 150 words
THE METHOD OF TREATING AN OIL JWELL PENETRATING A PETROLEUM-BEARING FORMATION WHICH ADMITS WATER OR BRINE TO THE WELL, THE WELL HAVING THE USUAL CASING THEREIN, SO AS TO IMPROVE THE RATIO OF THE RATE OF OIL PRODUCTION TO THAT OF WATER OR BRINE WHICH COMPRISES MAKING AN INJECTION INTO THE PRODUCING FORMATION OF THE WELL OF A PUMPABLE SLURRY OF A HYDRAULIC CEMENT ON A LOW FLUID LOSS VEHICLE COMPRISING PETROLEUM OIL, SAID VEHICLE BEING FREE FROM WATER AND HAVING A FLUID LOSS OF NOT GREATER THAN 600 MILLILITERS IN 2 MINUTES AT 80*F. AND CHASING THE INJECTION OF THE SLURRY WITH AN INJECTION OF PERTOLEUM OIL DEVOID OF CEMENT IN A VOLUME AT LEAST ONE-HALF THAT OF THE SLURRY, AND SHUTTING IN THE WELL SO AS TO ALLOW THE CEMENT TO HYDRATE IN THE PRESENCE OF THE WATER OR BRINE ENCOUNTERED BY THE CEMENT IN THE EARTH FORMATIONS.
Claim 2
Independent Claim 150 words
THE METHOD OF TREATING AN OIL JWELL PENETRATING A PETROLEUM-BEARING FORMATION WHICH ADMITS WATER OR BRINE TO THE WELL, THE WELL HAVING THE USUAL CASING THEREIN, SO AS TO IMPROVE THE RATIO OF THE RATE OF OIL PRODUCTION TO THAT OF WATER OR BRINE WHICH COMPRISES MAKING AN INJECTION INTO THE PRODUCING FORMATION OF THE WELL OF A PUMPABLE SLURRY OF A HYDRAULIC CEMENT ON A LOW FLUID LOSS VEHICLE COMPRISING PETROLEUM OIL, SAID VEHICLE BEING FREE FROM WATER AND HAVING A FLUID LOSS OF NOT GREATER THAN 600 MILLILITERS IN 2 MINUTES AT 80*F. AND CHASING THE INJECTION OF THE SLURRY WITH AN INJECTION OF PERTOLEUM OIL DEVOID OF CEMENT IN A VOLUME AT LEAST ONE-HALF THAT OF THE SLURRY, AND SHUTTING IN THE WELL SO AS TO ALLOW THE CEMENT TO HYDRATE IN THE PRESENCE OF THE WATER OR BRINE ENCOUNTERED BY THE CEMENT IN THE EARTH FORMATIONS.

References Cited (Backward Citations)

US1107979A Cited
US1772999A Cited
US2146480A Cited
US2065512A Cited
US2285302A Cited
US2379516A Cited
US2800963A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1962-05-18 1962-11-17 1963-05-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1966-05-18 1966-11-17 1967-05-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1970-05-18 1970-11-17 1971-05-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag