← Back to Patent Explorer
US2863816A Expired / Lapsed US ⏱️ 0.0 years remaining

Neutronic reactor fuel element

Assignee: Individual
•
Filing: 1955-10-21
•
Granted: 1958-12-09
•
Expires: 1975-10-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 John T Stacy

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 05:32
CPC Classifications
G; G21; G21C; G21C3/00; G21C3/02; G21C3/04; G21C3/16; G21C3/20; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 58 words
A FUEL ELEMENT FOR A NEUTRONIC REACTOR COMPRISING A CYLINDRICAL CORE OF A MOLYBDENUM-URANIUM ALLOY CONTAINING 7 TO 10% BY WEIGHT MOLYBDENUM, A TIGHT-FITTING JACKET OF STAINLESS STEEL ON THE CORE, AND A BARRIER COAT INTERPOSED BETWEEN THE CORE AND THE JACKET, SAID COAT BEING A METAL OF THE GROUP CONSISTING OF TUNGSTEN, TANTALUM, MOLYBDENUM, COLUMBIUM AND SILVER.
Claim 2
Dependent Claim 58 words
A FUEL ELEMENT FOR A NEUTRONIC REACTOR COMPRISING A CYLINDRICAL CORE OF A MOLYBDENUM-URANIUM ALLOY CONTAINING 7 TO 10% BY WEIGHT MOLYBDENUM, A TIGHT-FITTING JACKET OF STAINLESS STEEL ON THE CORE, AND A BARRIER COAT INTERPOSED BETWEEN THE CORE AND THE JACKET, SAID COAT BEING A METAL OF THE GROUP CONSISTING OF TUNGSTEN, TANTALUM, MOLYBDENUM, COLUMBIUM AND SILVER.

References Cited (Backward Citations)

US1759454A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1961-12-08 1962-06-09 1962-12-09 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1965-12-08 1966-06-09 1966-12-09 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1969-12-08 1970-06-09 1970-12-09 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag