US2855273A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of preparing titanium tetrachloride
Assignee: British Titan Products Co Ltd
•
Filing: 1955-05-20
•
Granted: 1958-10-07
•
Expires: 1975-05-20
Abstract
No abstract record available.
Inventors
- 👤 Evans Arthur Wallace
- 👤 Groves James Dennis
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-25 17:32
CPC Classifications
C; C22; C22B; C22B34/00; C22B34/10; C22B34/12; C22B34/1218; C22B34/1222; Y; Y02; Y02P; Y02P10/00; Y02P10/20
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
164 words
A METHOD OF PREPARING TITANIUM TETRACHLORIDE WHICH COMPRISES ESTABLISHING A DYNAMIC BED IN A REACTION ZONE, SAID BED COMPRISING TITANIUM OXIDE BEARING MATERIAL HAVING A PARTICLE SIZE LARGELY IN THE RANGE OF 75 TO 500 MICRONS AND AT LEAST ABOUT 15 PERCENT BY WEIGHT OF CARBON, SAID BED BEING FLUIDIZED BY A FLUIDIZING STREAM COMPRISING ELEMENTAL CHLORINE, SUPPLYING THE CHLORINE TO SAID BED AT A RATE OF 40 TO 250 POUNDS PER HOUR PER SQUARE FOOT OF REACTION ZONE CROSS-SECTION FROM A RESERVOIR OF CHLORINE THROUGH A PLURALITY OF ORIFICES, MAINTAINING A PRESSURE DROP ACROSS SAID ORIFICES, OF AT LEAST 2 POUNDS PER SQUARE INCH, MAINTAINING THE TEMPERATURE OF SAID BED ABOVE 700*C. WHEREBY TITANIUM TETRACHLORIDE IS FORMED AND VOLATILIZED, ADDING FURTHER TITANIUM BEARING MATERIAL AND CARBON TO SAID BED, AND MAINTAINING THE DEPTH OF SAID BED SUFFICIENTLY LOW TO MAINTAIN THE RATIO OF THE PRESSURE DROP ACROSS THE BED TO THE PRESSURE DROP ACROSS THE ORIFICES NOT IN EXCESS OF TWO TO ONE.
Claim 2
Independent Claim
164 words
A METHOD OF PREPARING TITANIUM TETRACHLORIDE WHICH COMPRISES ESTABLISHING A DYNAMIC BED IN A REACTION ZONE, SAID BED COMPRISING TITANIUM OXIDE BEARING MATERIAL HAVING A PARTICLE SIZE LARGELY IN THE RANGE OF 75 TO 500 MICRONS AND AT LEAST ABOUT 15 PERCENT BY WEIGHT OF CARBON, SAID BED BEING FLUIDIZED BY A FLUIDIZING STREAM COMPRISING ELEMENTAL CHLORINE, SUPPLYING THE CHLORINE TO SAID BED AT A RATE OF 40 TO 250 POUNDS PER HOUR PER SQUARE FOOT OF REACTION ZONE CROSS-SECTION FROM A RESERVOIR OF CHLORINE THROUGH A PLURALITY OF ORIFICES, MAINTAINING A PRESSURE DROP ACROSS SAID ORIFICES, OF AT LEAST 2 POUNDS PER SQUARE INCH, MAINTAINING THE TEMPERATURE OF SAID BED ABOVE 700*C. WHEREBY TITANIUM TETRACHLORIDE IS FORMED AND VOLATILIZED, ADDING FURTHER TITANIUM BEARING MATERIAL AND CARBON TO SAID BED, AND MAINTAINING THE DEPTH OF SAID BED SUFFICIENTLY LOW TO MAINTAIN THE RATIO OF THE PRESSURE DROP ACROSS THE BED TO THE PRESSURE DROP ACROSS THE ORIFICES NOT IN EXCESS OF TWO TO ONE.
References Cited (Backward Citations)
US2486912A
Cited
US2654659A
Cited
US2608474A
Cited
US2701179A
Cited
US2760917A
Cited
US2701180A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1961-10-06 | 1962-04-07 | 1962-10-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1965-10-06 | 1966-04-07 | 1966-10-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1969-10-06 | 1970-04-07 | 1970-10-07 | $7700.00 | Window Closed / Lapsed |