← Back to Patent Explorer
US2855273A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of preparing titanium tetrachloride

Assignee: British Titan Products Co Ltd
•
Filing: 1955-05-20
•
Granted: 1958-10-07
•
Expires: 1975-05-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Evans Arthur Wallace
  • 👤 Groves James Dennis

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 17:32
CPC Classifications
C; C22; C22B; C22B34/00; C22B34/10; C22B34/12; C22B34/1218; C22B34/1222; Y; Y02; Y02P; Y02P10/00; Y02P10/20

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 164 words
A METHOD OF PREPARING TITANIUM TETRACHLORIDE WHICH COMPRISES ESTABLISHING A DYNAMIC BED IN A REACTION ZONE, SAID BED COMPRISING TITANIUM OXIDE BEARING MATERIAL HAVING A PARTICLE SIZE LARGELY IN THE RANGE OF 75 TO 500 MICRONS AND AT LEAST ABOUT 15 PERCENT BY WEIGHT OF CARBON, SAID BED BEING FLUIDIZED BY A FLUIDIZING STREAM COMPRISING ELEMENTAL CHLORINE, SUPPLYING THE CHLORINE TO SAID BED AT A RATE OF 40 TO 250 POUNDS PER HOUR PER SQUARE FOOT OF REACTION ZONE CROSS-SECTION FROM A RESERVOIR OF CHLORINE THROUGH A PLURALITY OF ORIFICES, MAINTAINING A PRESSURE DROP ACROSS SAID ORIFICES, OF AT LEAST 2 POUNDS PER SQUARE INCH, MAINTAINING THE TEMPERATURE OF SAID BED ABOVE 700*C. WHEREBY TITANIUM TETRACHLORIDE IS FORMED AND VOLATILIZED, ADDING FURTHER TITANIUM BEARING MATERIAL AND CARBON TO SAID BED, AND MAINTAINING THE DEPTH OF SAID BED SUFFICIENTLY LOW TO MAINTAIN THE RATIO OF THE PRESSURE DROP ACROSS THE BED TO THE PRESSURE DROP ACROSS THE ORIFICES NOT IN EXCESS OF TWO TO ONE.
Claim 2
Independent Claim 164 words
A METHOD OF PREPARING TITANIUM TETRACHLORIDE WHICH COMPRISES ESTABLISHING A DYNAMIC BED IN A REACTION ZONE, SAID BED COMPRISING TITANIUM OXIDE BEARING MATERIAL HAVING A PARTICLE SIZE LARGELY IN THE RANGE OF 75 TO 500 MICRONS AND AT LEAST ABOUT 15 PERCENT BY WEIGHT OF CARBON, SAID BED BEING FLUIDIZED BY A FLUIDIZING STREAM COMPRISING ELEMENTAL CHLORINE, SUPPLYING THE CHLORINE TO SAID BED AT A RATE OF 40 TO 250 POUNDS PER HOUR PER SQUARE FOOT OF REACTION ZONE CROSS-SECTION FROM A RESERVOIR OF CHLORINE THROUGH A PLURALITY OF ORIFICES, MAINTAINING A PRESSURE DROP ACROSS SAID ORIFICES, OF AT LEAST 2 POUNDS PER SQUARE INCH, MAINTAINING THE TEMPERATURE OF SAID BED ABOVE 700*C. WHEREBY TITANIUM TETRACHLORIDE IS FORMED AND VOLATILIZED, ADDING FURTHER TITANIUM BEARING MATERIAL AND CARBON TO SAID BED, AND MAINTAINING THE DEPTH OF SAID BED SUFFICIENTLY LOW TO MAINTAIN THE RATIO OF THE PRESSURE DROP ACROSS THE BED TO THE PRESSURE DROP ACROSS THE ORIFICES NOT IN EXCESS OF TWO TO ONE.

References Cited (Backward Citations)

US2486912A Cited
US2654659A Cited
US2608474A Cited
US2701179A Cited
US2760917A Cited
US2701180A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1961-10-06 1962-04-07 1962-10-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1965-10-06 1966-04-07 1966-10-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1969-10-06 1970-04-07 1970-10-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag