US2812491A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Electrical tester for non-metallic linings
Assignee: Wyeth Holdings LLC
•
Filing: 1957-01-11
•
Granted: 1957-11-05
•
Expires: 1977-01-11
Abstract
No abstract record available.
Inventors
- 👤 Charles W Figlio
- 👤 John S Magielnicki
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 19:26
CPC Classifications
G; G01; G01N; G01N27/00; G01N27/02; G01N27/04; G01N27/20; G01N27/205
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
167 words
A RAPID METHOD OF DETECTING MINUTE BREAKS IN THE ON-CONDUCTING LINING OF METALLIC CHEMICAL VESSELS PROTECTED BY SAID NON-CONDUCTING LINING FROM CORROSIVE ATTACK WHICH COMPRISES APPLYING A LOW VOLTAGE SOURCE BETWEEN THE SAID METAL KETTLE AND A PARALLEL NEON GLOW TUBE CONDENSER CIRCUIT THROUG A VARIABLE RESISTANCE, SAID PARALLEL CIRCUIT BEING IN SERIES WITH S SWAB SATURATED WITH A CONDUCTING ELECTROLYTE, SAID SWAB BEING VERY SMALL IN AREA IN COMPARISON WITH THE TOTAL AREA OF THE SAID NON-CONDUCTING LINING BEING TESTED, AND MOVING THE SAID SWAB, WHILE DETACTING THE RATE OF FLASHING OF THE NEON GLOW TUBE, OVER THE AREA OF SAID NON-CONDUCTING LINING, AND DETERMINING THE LOCATION OF SAID BREAKS IN SAID NON-CONDUCTING LINING BEFORE THE SAID SWAB HAS CONTACTED SAID NEON GLOW TUBE INCREASE IN THE RATE OF FLASHING OF SID NEON GLOW TUBE WHEN MOVED OVER A DISTANCE MANY TIMES THE DIAMETER OF SAID SWAB FROM A PLURALITY OF DIRECTION RELATIVE TO SAID BREAM, THUS OBTAINING A CROSS-BEARING ON THE LOCATION OF SAID BREAK.
Claim 2
Dependent Claim
167 words
A RAPID METHOD OF DETECTING MINUTE BREAKS IN THE ON-CONDUCTING LINING OF METALLIC CHEMICAL VESSELS PROTECTED BY SAID NON-CONDUCTING LINING FROM CORROSIVE ATTACK WHICH COMPRISES APPLYING A LOW VOLTAGE SOURCE BETWEEN THE SAID METAL KETTLE AND A PARALLEL NEON GLOW TUBE CONDENSER CIRCUIT THROUG A VARIABLE RESISTANCE, SAID PARALLEL CIRCUIT BEING IN SERIES WITH S SWAB SATURATED WITH A CONDUCTING ELECTROLYTE, SAID SWAB BEING VERY SMALL IN AREA IN COMPARISON WITH THE TOTAL AREA OF THE SAID NON-CONDUCTING LINING BEING TESTED, AND MOVING THE SAID SWAB, WHILE DETACTING THE RATE OF FLASHING OF THE NEON GLOW TUBE, OVER THE AREA OF SAID NON-CONDUCTING LINING, AND DETERMINING THE LOCATION OF SAID BREAKS IN SAID NON-CONDUCTING LINING BEFORE THE SAID SWAB HAS CONTACTED SAID NEON GLOW TUBE INCREASE IN THE RATE OF FLASHING OF SID NEON GLOW TUBE WHEN MOVED OVER A DISTANCE MANY TIMES THE DIAMETER OF SAID SWAB FROM A PLURALITY OF DIRECTION RELATIVE TO SAID BREAM, THUS OBTAINING A CROSS-BEARING ON THE LOCATION OF SAID BREAK.
References Cited (Backward Citations)
US1938684A
Cited
US2031840A
Cited
US2105542A
Cited
US2170487A
Cited
GB494345A
Cited
US2376232A
Cited
US2379947A
Cited
US2515736A
Cited
US2504848A
Cited
US2572597A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1960-11-04 | 1961-05-06 | 1961-11-05 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1964-11-04 | 1965-05-06 | 1965-11-05 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1968-11-04 | 1969-05-06 | 1969-11-05 | $7700.00 | Window Closed / Lapsed |