← Back to Patent Explorer
US2811207A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of vertically fracturing formations in wells

Assignee: ConocoPhillips Co
•
Filing: 1955-01-26
•
Granted: 1957-10-29
•
Expires: 1975-01-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jr Roscoe C Clark

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 05:09
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/62; C09K8/64

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 159 words
THE METHOD OF EFFECTING A VERTICALLY EXTENDING FRACTURE IN A LAYER SUBSURFACE FORMATION PENETRATED BY A WELL BORE WHICH COMPRISES FORMING AN IMPERMEABLE SHEATH ON THE SURFACE OF THE WELL BORE BY PUMPING A FLUID MASS INTO THE WELL BORE IN THE AREA OF SAID FORMATION, SAID FLUID MASS POSSESSING A FLUID LOSS OF LESS THAN 5 CC. IN 30 MINUTES AS DETERMINED BY AN API RP NO. 29 TEST CONDUCTED AT A TEMPERATURE WITHIN THE RANGE OF FROM 90 TO 350*C., ALTERNATELY PUMPING AND STOPPING THE FLOW OF A SECOND FLUID MASS INTO THE WELL BORE, THUS GRADUALLY INCREASING THE HYDROSTATIC PRESSURE UPON SAID FIRST MENTIONED FLUID MASS UNTIL THE PRESSURE DROP OVER AN HOUR''S TIME AFTER THE FLOW OF THE SAID SECOND MENTIONED FLUID CEASES DOES NOT EXCEED 5 PERCENT OF THE HYDROSTATIC PRESSURE REACHED DURING THE PUMPING OPERATION AND THEN RAPIDLY INCREASING THE HYDROSTATIC PRESSURE ON SAID FIRST MENTIONED FLUID MASS UNTIL SAID FORMATION IS FRACTURED.
Claim 2
Independent Claim 159 words
THE METHOD OF EFFECTING A VERTICALLY EXTENDING FRACTURE IN A LAYER SUBSURFACE FORMATION PENETRATED BY A WELL BORE WHICH COMPRISES FORMING AN IMPERMEABLE SHEATH ON THE SURFACE OF THE WELL BORE BY PUMPING A FLUID MASS INTO THE WELL BORE IN THE AREA OF SAID FORMATION, SAID FLUID MASS POSSESSING A FLUID LOSS OF LESS THAN 5 CC. IN 30 MINUTES AS DETERMINED BY AN API RP NO. 29 TEST CONDUCTED AT A TEMPERATURE WITHIN THE RANGE OF FROM 90 TO 350*C., ALTERNATELY PUMPING AND STOPPING THE FLOW OF A SECOND FLUID MASS INTO THE WELL BORE, THUS GRADUALLY INCREASING THE HYDROSTATIC PRESSURE UPON SAID FIRST MENTIONED FLUID MASS UNTIL THE PRESSURE DROP OVER AN HOUR''S TIME AFTER THE FLOW OF THE SAID SECOND MENTIONED FLUID CEASES DOES NOT EXCEED 5 PERCENT OF THE HYDROSTATIC PRESSURE REACHED DURING THE PUMPING OPERATION AND THEN RAPIDLY INCREASING THE HYDROSTATIC PRESSURE ON SAID FIRST MENTIONED FLUID MASS UNTIL SAID FORMATION IS FRACTURED.

References Cited (Backward Citations)

US2734861A Cited
US2645291A Cited
US2547778A Cited
US2650195A Cited
US2699213A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1960-10-28 1961-04-29 1961-10-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1964-10-28 1965-04-29 1965-10-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1968-10-28 1969-04-29 1969-10-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag