← Back to Patent Explorer
US2801698A Expired / Lapsed US ⏱️ 0.0 years remaining

Increasing effective permeability of rock around a well bore

Assignee: Pure Oil Co
•
Filing: 1954-10-27
•
Granted: 1957-08-06
•
Expires: 1974-10-27
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Donald C Bond

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 01:52
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/62

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 107 words
A METHOD FOR INCREASING THE PRODUCTIVETY OF A DLUIDBEARING RESERVIOR TRAVERSED BY A BORE HOLE WHICH COMPRISES INTRODUCTING INTO SAID RESERVIOR A HYDROUS, FLUID SUBSTANCE CONVERTIBLE TO A SOLID OF INCREASED VOLUME UPON COOLING, FREEZING SAID FLUID SUBSTANCE BY WITHDRAWING SUFICIENT HEAT THEREFROM TO EFFECT ITS SOLIDIFICATION WHEREBY SAID FLUID-BEARING RESERVIOR IS TEMPORARITY SHUT OFF FROM SAID BORE HOLE, INTRODUCTING A NON-THICKENED FLUID, PRESSURE-TRANSMITTING MEDIUM INTO SAID BORE HOLE IN CONTACT WITH SAID RESERVOIR, AND APPLYING SUFFICIENT PRESURE TO SAID FLUID PRESSURE-TRANSMITTING MEDIUM WHEREBY A FORCE IS TRANSMITTED TO THE TEMPORILY SHUT OFF RESERSVOIR TO OVERCOME THE STRENGTH OF COHENSION OF SAID RESERSVOIR AND PRODUCE FRACTURE THEREIN.
Claim 2
Independent Claim 107 words
A METHOD FOR INCREASING THE PRODUCTIVETY OF A DLUIDBEARING RESERVIOR TRAVERSED BY A BORE HOLE WHICH COMPRISES INTRODUCTING INTO SAID RESERVIOR A HYDROUS, FLUID SUBSTANCE CONVERTIBLE TO A SOLID OF INCREASED VOLUME UPON COOLING, FREEZING SAID FLUID SUBSTANCE BY WITHDRAWING SUFICIENT HEAT THEREFROM TO EFFECT ITS SOLIDIFICATION WHEREBY SAID FLUID-BEARING RESERVIOR IS TEMPORARITY SHUT OFF FROM SAID BORE HOLE, INTRODUCTING A NON-THICKENED FLUID, PRESSURE-TRANSMITTING MEDIUM INTO SAID BORE HOLE IN CONTACT WITH SAID RESERVOIR, AND APPLYING SUFFICIENT PRESURE TO SAID FLUID PRESSURE-TRANSMITTING MEDIUM WHEREBY A FORCE IS TRANSMITTED TO THE TEMPORILY SHUT OFF RESERSVOIR TO OVERCOME THE STRENGTH OF COHENSION OF SAID RESERSVOIR AND PRODUCE FRACTURE THEREIN.

References Cited (Backward Citations)

US1342780A Cited
US2412765A Cited
US2661066A Cited
US2676662A Cited
US2693857A Cited
US2596843A Cited
US2681704A Cited
US2672935A Cited
US2699213A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1960-08-05 1961-02-04 1961-08-06 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1964-08-05 1965-02-04 1965-08-06 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1968-08-05 1969-02-04 1969-08-06 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag