US2742343A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Circulation of granular solids through a process system
Assignee: Sunoco Inc
•
Filing: 1951-10-09
•
Granted: 1956-04-17
•
Expires: 1971-10-09
Abstract
No abstract record available.
Inventors
- 👤 William L Mcclure
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 20:50
CPC Classifications
B; B01; B01J; B01J8/00; B01J8/005
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
215 words
IN A PROCESS WHICH COMPRISES CIRCULATING THROUGH A PROCESS SYSTEM GRANULAR CONTACT MATERIAL COMPRISING RELATIVELY FINE AND RELATIVELY COARSE GRANULES AND WHICH INCLUDES THE STEPS OF GRAVITATING A RELATIVELY CONSTRICTED SEAL LEG STREAM OF GRANULAR CONTACT MATERIAL FROM A RELATIVELY ENLARGED SUPPLY ZONE AS A COMPACT MASS THROUGH A SUBSTANTIAL VERTICAL DISTANCE AND OF INTRODUCING A PORTION OF THE CONTACT MATERIAL IN SAID SYSTEM AS AN ELUTRIATOR STREAM INTO AN ELUTRIATING ZONE, THE IMPROVEMENT WHICH COMPRISES: PASSING CONTACT MATERIAL DOWN IN SAID SUPPLY ZONE AS A DOWNWARDLY CONVERGING FRUSTOCONICAL STREAM AND THENCE INTO A SEAL LEG STREAM; PASSING A SMALL PORTION OF THE CONTACT MATERIAL IN SAID FRUSTOCONICAL STREAM DOWN FROM THE UNDER SURFACE OF SAID FURSTOCONICAL STREAM INTO A DOWNWARDLY CONVERGING SECOND FRUSTOCONICAL STREAM HAVING LESSER VOLUMETRIC FLOW RATE OF SOLIDS THAN SAID FIRST-NAMED FRUSTOCONICAL STREAM AND THENCE INTO AN ELUTRIATOR STREAM; AND SEPARATELY REMOVING SAID ELUTRIATOR STREAM AND SAID SEAL LEG STREAM FROM A LOWER PORTION OF SAID SUPPLY ZONE, SAID ELUTRIATOR STREAM AND SAID SEAL LEG STREAM BEING REMOVED FROM SAID SUPPLY ZONE THROUGH OUTLETS THE HORIZONTAL DISTANCE BETWEEN THE CENTERS OF WHICH IS LESS THAN ONE-HALF THE MAJOR DIMENSION OF THE HORIZONTAL CROSS-SECTION OF THE SUPPLY ZONE AT THE LEVEL OF THE OUTLET FROM WHICH SAID SEAL LEG STREAM IS REMOVED.
Claim 2
Dependent Claim
215 words
IN A PROCESS WHICH COMPRISES CIRCULATING THROUGH A PROCESS SYSTEM GRANULAR CONTACT MATERIAL COMPRISING RELATIVELY FINE AND RELATIVELY COARSE GRANULES AND WHICH INCLUDES THE STEPS OF GRAVITATING A RELATIVELY CONSTRICTED SEAL LEG STREAM OF GRANULAR CONTACT MATERIAL FROM A RELATIVELY ENLARGED SUPPLY ZONE AS A COMPACT MASS THROUGH A SUBSTANTIAL VERTICAL DISTANCE AND OF INTRODUCING A PORTION OF THE CONTACT MATERIAL IN SAID SYSTEM AS AN ELUTRIATOR STREAM INTO AN ELUTRIATING ZONE, THE IMPROVEMENT WHICH COMPRISES: PASSING CONTACT MATERIAL DOWN IN SAID SUPPLY ZONE AS A DOWNWARDLY CONVERGING FRUSTOCONICAL STREAM AND THENCE INTO A SEAL LEG STREAM; PASSING A SMALL PORTION OF THE CONTACT MATERIAL IN SAID FRUSTOCONICAL STREAM DOWN FROM THE UNDER SURFACE OF SAID FURSTOCONICAL STREAM INTO A DOWNWARDLY CONVERGING SECOND FRUSTOCONICAL STREAM HAVING LESSER VOLUMETRIC FLOW RATE OF SOLIDS THAN SAID FIRST-NAMED FRUSTOCONICAL STREAM AND THENCE INTO AN ELUTRIATOR STREAM; AND SEPARATELY REMOVING SAID ELUTRIATOR STREAM AND SAID SEAL LEG STREAM FROM A LOWER PORTION OF SAID SUPPLY ZONE, SAID ELUTRIATOR STREAM AND SAID SEAL LEG STREAM BEING REMOVED FROM SAID SUPPLY ZONE THROUGH OUTLETS THE HORIZONTAL DISTANCE BETWEEN THE CENTERS OF WHICH IS LESS THAN ONE-HALF THE MAJOR DIMENSION OF THE HORIZONTAL CROSS-SECTION OF THE SUPPLY ZONE AT THE LEVEL OF THE OUTLET FROM WHICH SAID SEAL LEG STREAM IS REMOVED.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1959-04-17 | 1959-10-17 | 1960-04-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1963-04-17 | 1963-10-17 | 1964-04-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1967-04-17 | 1967-10-17 | 1968-04-17 | $7700.00 | Window Closed / Lapsed |