← Back to Patent Explorer
US2728656A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of preparing lead alloys

Assignee: Ethyl Corp
•
Filing: 1952-02-29
•
Granted: 1955-12-27
•
Expires: 1972-02-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Clarence M Neher

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 16:04
CPC Classifications
C; C22; C22C; C22C11/00; C22C11/02; Y; Y10; Y10T; Y10T137/00; Y10T137/0318; Y10T137/0324; Y10T137/0329; Y10T137/034

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 173 words
A PROCESS FOR CONTINUOUSLY MANUFACTURING A MOLTEN ALLOY OF LEAD AND AT LEAST ONE ALKALI METAL COMPRISING PROVIDING A STREAM COMPRISING MOLTEN LEAD, AND A STREAM OF MOLTEN ALKALI METAL, THE FLOW OF ONE OF SAID STREAMS BEING CONTROLLED BY MEANS RESPONSIVE TO A VOLTAGE DIFFERENCE, COMBINING THE LEAD AND ALKALI METAL STREAMS AS AN ADDITIONAL COMBINED STREAM AND MIXING THE LEAD AND THE ALKALI METALS IN THE COMBINED STREAM AND CONCURRENTLY WITH THE MIXING REMOVING THE HEAT GENERATED AND COOLING TO A CONSTANT TEMPERATURE, ABOVE THE MELTING POINT OF THE ALLOY DESIRED, THEN PASSING SAID COMBINED STREAM PAST A REFERENCE METAL SPECIMEN, COMPRISING AN ALKALI METAL CORRESPONDING TO A COMPONENT OF THE ALLOY, THE SPECIMEN BEING ISOLATED FROM THE PERIPHERY OF THE COMBINED STREAM, AND SEPARATED FROM THE COMBINED STREAM BY A MEMBRANE PERMEABLE TO IONS OF THE REFERENCE METAL, WHEREBY A VOLTAGE DIFFERENCE IS DEVELOPED BETWEEN THE COMBINED ALLOY STREAM AND THE REFERENCE METAL, AND TRANSMITTING THE VOLTAGE DIFFERENCE TO THE MEANS FOR CONTROLLING THE FLOW OF ONE OF SAID STREAMS.
Claim 2
Dependent Claim 173 words
A PROCESS FOR CONTINUOUSLY MANUFACTURING A MOLTEN ALLOY OF LEAD AND AT LEAST ONE ALKALI METAL COMPRISING PROVIDING A STREAM COMPRISING MOLTEN LEAD, AND A STREAM OF MOLTEN ALKALI METAL, THE FLOW OF ONE OF SAID STREAMS BEING CONTROLLED BY MEANS RESPONSIVE TO A VOLTAGE DIFFERENCE, COMBINING THE LEAD AND ALKALI METAL STREAMS AS AN ADDITIONAL COMBINED STREAM AND MIXING THE LEAD AND THE ALKALI METALS IN THE COMBINED STREAM AND CONCURRENTLY WITH THE MIXING REMOVING THE HEAT GENERATED AND COOLING TO A CONSTANT TEMPERATURE, ABOVE THE MELTING POINT OF THE ALLOY DESIRED, THEN PASSING SAID COMBINED STREAM PAST A REFERENCE METAL SPECIMEN, COMPRISING AN ALKALI METAL CORRESPONDING TO A COMPONENT OF THE ALLOY, THE SPECIMEN BEING ISOLATED FROM THE PERIPHERY OF THE COMBINED STREAM, AND SEPARATED FROM THE COMBINED STREAM BY A MEMBRANE PERMEABLE TO IONS OF THE REFERENCE METAL, WHEREBY A VOLTAGE DIFFERENCE IS DEVELOPED BETWEEN THE COMBINED ALLOY STREAM AND THE REFERENCE METAL, AND TRANSMITTING THE VOLTAGE DIFFERENCE TO THE MEANS FOR CONTROLLING THE FLOW OF ONE OF SAID STREAMS.

References Cited (Backward Citations)

US1450023A Cited
US2091801A Cited
DE741982C Cited
US2621671A Cited
US2565121A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1958-12-26 1959-06-27 1959-12-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1962-12-26 1963-06-27 1963-12-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1966-12-26 1967-06-27 1967-12-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag