← Back to Patent Explorer
US2676092A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for recovering iodine from oil well brine

Assignee: Texaco Inc
•
Filing: 1953-03-30
•
Granted: 1954-04-20
•
Expires: 1973-03-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Joseph C Allen

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-30 14:54
CPC Classifications
C; C01; C01B; C01B7/00; C01B7/13; C01B7/14

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 66 words
A PROCESS FOR RECOVERING IODINE FROM IODINECONTAINING OIL WELL BRINES WHICH COMPRISES BLOWING SAID BRINE IN A CONTACT ZONE WITH NATURAL GAS AT A PRESSURE BETWEEN 3,000 AND 4,500 P. S. I. G., REMOVING FROM SAID CONTACT ZONE AN IODINE-CONTAINING GAS STREAM AND EXPANDING SAID GAS STREAM TO A PRESSURE BETWEEN 500 AND 1,200 P.S.I.G. WHEREBY IODINE SEPARATES AS A CRYSTALLINE SOLID FROM SAID EFFLUENT GAS.
Claim 2
Dependent Claim 66 words
A PROCESS FOR RECOVERING IODINE FROM IODINECONTAINING OIL WELL BRINES WHICH COMPRISES BLOWING SAID BRINE IN A CONTACT ZONE WITH NATURAL GAS AT A PRESSURE BETWEEN 3,000 AND 4,500 P. S. I. G., REMOVING FROM SAID CONTACT ZONE AN IODINE-CONTAINING GAS STREAM AND EXPANDING SAID GAS STREAM TO A PRESSURE BETWEEN 500 AND 1,200 P.S.I.G. WHEREBY IODINE SEPARATES AS A CRYSTALLINE SOLID FROM SAID EFFLUENT GAS.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1957-04-19 1957-10-19 1958-04-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1961-04-19 1961-10-19 1962-04-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1965-04-19 1965-10-19 1966-04-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag