US2615822A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of making sheet or web material
Assignee: Individual
•
Filing: 1946-02-21
•
Granted: 1952-10-28
•
Expires: 1966-02-21
Abstract
No abstract record available.
Inventors
- 👤 William C Huebner
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 21:29
CPC Classifications
D; D21; D21H; D21H5/00; D21H5/26; D21H27/00
Claims Analysis
Total Claims: 1
Claim 1
Independent Claim
309 words
THE METHOD OF MAKING LAMINATED WEBS, SHEETS OR COATINGS WHICH COMPRISES CREATING AND MAINTAINING AT SPACED SUCCESSIVELY ARRANGED DEPOSIT STATIONS ELECTROSTATIC FIELDS OF FORCE EACH EXTENDING THROUGHOUT A ZONE OF COMPLETE TRANSVERSE WIDTH OF THE WEB, SHEET OR COATING TO BE PRODUCED AND ACROSS AN ATMOSPHERIC GAP BETWEEN AN ELONGATED DEPENDING DISCHARGE ELEMENT AND A SPACED ELONGATED ATTRACTION ELEMENT WITH BOTH OF SAID ELEMENTS CONNECTED INTO A HIGH POTENTIAL ELECTRICAL CIRCUIT, CONTEMPORANEOUSLY WITH THE MAINTENANCE OF THE FIELDS OF FORCE FLOWING LIQUIFIED COMPOSITIONS IN FLOWABLE FORM AND CONTAINING ELECTRICALLY CHARGEABLE MATERIAL AT REGULATED FLOW RATES AND ONTO SAID DISCHARGE ELEMENTS IN THE FORM OF FILMS OF THE COMPOSITIONS OF PREDETERMINED THICKNESS SUCH THAT THE FILMS NORMALLY WOULD BE RETAINED ON SAID ELEMENTS BY SURFACE TENSION BUT ARE MIGRATED THEREFROM BY THE LINES OF FORCE OF THE ELECTROSTATIC FIELDS OF FORCE THROUGH THE ATMOSPHERIC GAPS AT THE DEPOSIT STATIONS TOWARD SAID ATTRACTION ELEMENTS, SIMULTANEOUSLY AND CONTINUOUSLY DURING THE MAINTENANCE OF THE FIELDS OF FORCE MOVING AN INTERCEPTING MEMBER LINEARLY THROUGH SAID SUCCESSIVE ATMOSPHERIC GAPS AT A PREDETERMINED RATE TO INTERCEPT SUCCESSIVELY THE MIGRATING COMPOSITIONS IN THE FORM OF A CONTINUOUS BASE DEPOSIT ON THE NUMBER AT THE FIRST DEPOSIT STATION AND IN THE FORM OF A CONTINUOUS SUPERIMPOSED DEPOSIT AT SUCCEEDING DEPOSIT STATIONS AND HAVING THE REQUIRED TRANSVERSE WIDTH OF THE WEB, SHEET OR COATING, SIMULTANEOUSLY AND CONTINUOUSLY DURING THE MAINTENANCE OF THE FIELDS OF FORCE INDUCING ELECTRICAL PRECHARGES TO THE FILM OF COMPOSITIONS ON THE DISCHARGE ELEMENTS AND ELECTICAL PRECHARGES TO THE INTERCEPTING MEMBER BEFORE ITS ENTERS EACH OF THE ELECTOSTATIC FIELDS OF FORCE FROM ELECTRICAL SOURCES INDEPENDENT OF THE ELECTRICAL SOURCES OF THE ELECTROSTATIC FIELDS OF FORCE, AND THEN PASSING THE MOVING INTERCEPTING MEMBER AND THE DEPOSITED COMPOSITIONS THROUGH AIR CURRENTS TO SOLIDIFY AND INTERGRATE THE DEPOSITED COMPOSITIONS BY THE THERMAL AND DEHUMIDIFING ACTION OF THE AIR CURRENTS.
References Cited (Backward Citations)
US894070A
Cited
US892188A
Cited
US1750177A
Cited
US1911808A
Cited
US1940654A
Cited
US1898611A
Cited
US2052131A
Cited
US2017339A
Cited
US2191827A
Cited
US2146025A
Cited
US2157478A
Cited
US2265455A
Cited
US2236861A
Cited
US2224391A
Cited
US2338570A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1955-10-28 | 1956-04-28 | 1956-10-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1959-10-28 | 1960-04-28 | 1960-10-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1963-10-28 | 1964-04-28 | 1964-10-28 | $7700.00 | Window Closed / Lapsed |