← Back to Patent Explorer
US2596844A Expired / Lapsed US ⏱️ 0.0 years remaining

Treatment of wells

Assignee: Stanolind Oil and Gas Co
•
Filing: 1949-12-31
•
Granted: 1952-05-13
•
Expires: 1969-12-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Joseph B Clark

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 16:07
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/60; C09K8/62; C09K8/64; Y; Y10; Y10S; Y10S507/00; Y10S507/922

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 150 words
A METHOD OF INCREASING THE PRODUCTIVITY OF A FORMATION PENETRATED BY A WELL THROUGH FRACTURING THE FORMATION, WHICH COMPRISES INTRODUCING INTO SAID WELL A FRACTURING MEDIUM CONTAINING AS ESSENTIAL CONSTITUENTS A LOW-VISCOSITY HYDROCARBON LIQUID AND A HYDROXY ALUMINUM SOAP GEL-FORMING MATERIAL, SAID SOAP BEING IN SUFFICIENT AMOUNT WHEN MIXED WITH SAID LIQUID TO PRODUCE A FRACTURING MEDIUM POSSESSING A VISCOSITY OF AT LEAST ABOUT 200 CENTIPOISES, PUMPING SAID FRACTURIN MEDIUM INTO A CONFINED ZONE IN SAID WELL ADJACENT AND FORMATION, PUMPIN ADDITIONAL LIQID INTO SAID WELL AFTER SAID FRACTURING MEDIUM, UNTIL A FRACTRE IN SAID FORMATION IS INDICATED SAID ADDITIONAL LIQUID INCLUDING A GEL BREAKER FOR SAID FRACTURING MEDIUM, CONTINUING PUMPING LIQUID INTO SAID WELL TO DISPLACE AT LEAST PART OF SAID FRACTURING MEDIUM AND AT LEAST PART OF SAID GEL BREAKER INTO SAID FRACTURE, WHEREBY THE VISCOSITY OF SAID FRACTURING MEDIUM IS SUBSTANTIALLY REDUCED, AND THEREAFTER PRODUCING SAID WELL.
Claim 2
Independent Claim 150 words
A METHOD OF INCREASING THE PRODUCTIVITY OF A FORMATION PENETRATED BY A WELL THROUGH FRACTURING THE FORMATION, WHICH COMPRISES INTRODUCING INTO SAID WELL A FRACTURING MEDIUM CONTAINING AS ESSENTIAL CONSTITUENTS A LOW-VISCOSITY HYDROCARBON LIQUID AND A HYDROXY ALUMINUM SOAP GEL-FORMING MATERIAL, SAID SOAP BEING IN SUFFICIENT AMOUNT WHEN MIXED WITH SAID LIQUID TO PRODUCE A FRACTURING MEDIUM POSSESSING A VISCOSITY OF AT LEAST ABOUT 200 CENTIPOISES, PUMPING SAID FRACTURIN MEDIUM INTO A CONFINED ZONE IN SAID WELL ADJACENT AND FORMATION, PUMPIN ADDITIONAL LIQID INTO SAID WELL AFTER SAID FRACTURING MEDIUM, UNTIL A FRACTRE IN SAID FORMATION IS INDICATED SAID ADDITIONAL LIQUID INCLUDING A GEL BREAKER FOR SAID FRACTURING MEDIUM, CONTINUING PUMPING LIQUID INTO SAID WELL TO DISPLACE AT LEAST PART OF SAID FRACTURING MEDIUM AND AT LEAST PART OF SAID GEL BREAKER INTO SAID FRACTURE, WHEREBY THE VISCOSITY OF SAID FRACTURING MEDIUM IS SUBSTANTIALLY REDUCED, AND THEREAFTER PRODUCING SAID WELL.

References Cited (Backward Citations)

US2300325A Cited
US2380893A Cited
US2264353A Cited
US2332822A Cited
US2354570A Cited
US2390609A Cited
US2379516A Cited
US2447064A Cited
US2491641A Cited
US2477296A Cited
US2458034A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1955-05-13 1955-11-12 1956-05-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1959-05-13 1959-11-12 1960-05-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1963-05-13 1963-11-12 1964-05-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag