US2559957A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Pebble heater
Assignee: Phillips Petroleum Co
•
Filing: 1946-09-27
•
Granted: 1951-07-10
•
Expires: 1966-09-27
Abstract
No abstract record available.
Inventors
- 👤 Harold J Hepp
- 👤 Myron O Kilpatrick
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 10:34
CPC Classifications
F; F28; F28C; F28C3/00; F28C3/10; F28C3/12; F28C3/14; B; B01; B01J; B01J8/00; B01J8/08; B01J8/087; C; C10; C10G; C10G9/00; C10G9/28; C10G9/30; B01J2208/00; B01J2208/00008; B01J2208/00017; B01J2208/00327; B01J2208/00336; B01J2208/0038
Claims Analysis
Total Claims: 1
Claim 1
Independent Claim
186 words
IN A PROCESS FOR CONVERSION OF HYDROCARBON INVOLVING CRACKING WHEREIN HYDROCARBON VAPOR IS PASSED UPWARDLY THROUGH A CONFINED UPRIGHT VERTICALLY EXTENDING ZONE IN INTIMATE CONTACT WITH A GRAVITATING BED OF HOT, REFRACTORY, PEBBLES INTRODUCED INTO THE UPPER PORTION OF SAID ZONE AND FLOWING OUT THE BOTTOM THEREOF, THEREBY HEATING AND AT LEAST PARTIALLY CRACKING SAID HYDROCARBON, AND AN EFFLUENT HYDROCARBON STREAM SUBJECT TO DEGRADATION REACTIONS WITH CONCOMITANT CARBON DEPOSITION IS REMOVED FROM THE UPPER PORTION OF SAID ZONE, THE IMPROVEMENT WHICH COMPRISES CONTINUOUSLY INTRODUCING SAID PEBBLES TO SAID ZONE THROUGH AN INLET AT THE JUNCTURE OF ITS UPPER AND LATERAL BOUNDARIES, THEREBY FORMING AND MAINTAINING A TOP SURFACE ON SAID PEBBLE BED CONFORMING TO THE NATURAL SLOPE THEREOF AND OBLIQUE TO THE AXIS OF SAID ZONE, AND CONTINUOUSLY FUNNELING THE CRACKED EFFLUENT THROUGH A ZONE OF GRADUALLY AND UNIFORMLY DECREASING VOLUME IN THE DIRECTION OF FLOW TO A VAPOR OUTLET OPPOSITE THE CENTER OF THE TOP SURFACE OF SAID PEBBLE BES SO AS TO DECREASE THE AVERAGE RESIDENCE TIME OF SAID EFFLUENT IN THE UPPER PORTION OF SAID ZONE AND REDUCE THE FORMATION OF CARBON THEREIN.
References Cited (Backward Citations)
US1146363A
Cited
US1450327A
Cited
US2159140A
Cited
US2393636A
Cited
US2418837A
Cited
US2389636A
Cited
US2412152A
Cited
US2429359A
Cited
US2443337A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1954-07-09 | 1955-01-08 | 1955-07-10 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1958-07-09 | 1959-01-08 | 1959-07-10 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1962-07-09 | 1963-01-08 | 1963-07-10 | $7700.00 | Window Closed / Lapsed |