Pebble heater apparatus

Assignee: Phillips Petroleum Co
•
Filing: 1947-11-21
•
Granted: 1950-12-12
•
Expires: 1967-11-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Louis J Weber

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-23 20:51
CPC Classifications
F; F28; F28C; F28C3/00; F28C3/10; F28C3/12; F28C3/14

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 180 words
IN A PEBBLE HEATER APPARATUS UTILIZING A MOVING BED OF HEATED PEBBLES, AN IMPROVED PEBBLE HEATING CHAMBER COMPRISING A SUBSTANTIALLY VERTICALLY DISPOSED CLOSED OUTER SHELL; INSULATING MEANS WITHIN ADAPTED SO ASA TO INSULATE SAID SHELL; PEBBLE INLET MEANS CENTRALLY DISPOSED IN THE UPPER PORTION OF SAID SHELL; EFFUENT OUTLET MEANS IN THE UPPER PORTION OF SAID SHELL; A PERFORATE REFACTORY LOAD-SUPPORTING DOME WITHIN SAID SHELL, INTERMEDIATE THE ENDS OF SAID SHELL AND DIVIDING THE CHAMBER WITHIN SAID SHELL IN A HEATING ZONE ABOVE SAID DOME AND A COMBUSTION ZONE BELOW SAID DOME; A FIRST PEBBLE CONDUIT MEANS EXTENDING SUBSTANTIALLY CENTRALLY THROUGH SAID DOME; A SECOND PEBLE CONDUIT MEANS EXTENDING CENTRALLY THROUGH THE BOTTOM OF SAID SHELL AND UPWARDLY INTO SAID COMBUSION ZONE AND ENCLOSING A PORTION OF SAID FIRST PEBBLE CONDUIT THEREIN SO AS TO FORM AN EXPANSION JOIN THEREBETWEEN, WHEREBY SAID FIRST AND SECOND PEBBLE CONDUITS FORM A PEBBLE OUTLET FROM SAID HEATING CHAMNBER; MEANS FOR SEPARATING PEBBLES WITHIN SAID HEATING ZONE FROM SAID DOME; AND FLUID HEAT EXCHANGE MATERIAL INLET CONDUIT MEANS IN SAID SHELL BELOW SAID DOME.
Claim 2
Dependent Claim 180 words
IN A PEBBLE HEATER APPARATUS UTILIZING A MOVING BED OF HEATED PEBBLES, AN IMPROVED PEBBLE HEATING CHAMBER COMPRISING A SUBSTANTIALLY VERTICALLY DISPOSED CLOSED OUTER SHELL; INSULATING MEANS WITHIN ADAPTED SO ASA TO INSULATE SAID SHELL; PEBBLE INLET MEANS CENTRALLY DISPOSED IN THE UPPER PORTION OF SAID SHELL; EFFUENT OUTLET MEANS IN THE UPPER PORTION OF SAID SHELL; A PERFORATE REFACTORY LOAD-SUPPORTING DOME WITHIN SAID SHELL, INTERMEDIATE THE ENDS OF SAID SHELL AND DIVIDING THE CHAMBER WITHIN SAID SHELL IN A HEATING ZONE ABOVE SAID DOME AND A COMBUSTION ZONE BELOW SAID DOME; A FIRST PEBBLE CONDUIT MEANS EXTENDING SUBSTANTIALLY CENTRALLY THROUGH SAID DOME; A SECOND PEBLE CONDUIT MEANS EXTENDING CENTRALLY THROUGH THE BOTTOM OF SAID SHELL AND UPWARDLY INTO SAID COMBUSION ZONE AND ENCLOSING A PORTION OF SAID FIRST PEBBLE CONDUIT THEREIN SO AS TO FORM AN EXPANSION JOIN THEREBETWEEN, WHEREBY SAID FIRST AND SECOND PEBBLE CONDUITS FORM A PEBBLE OUTLET FROM SAID HEATING CHAMNBER; MEANS FOR SEPARATING PEBBLES WITHIN SAID HEATING ZONE FROM SAID DOME; AND FLUID HEAT EXCHANGE MATERIAL INLET CONDUIT MEANS IN SAID SHELL BELOW SAID DOME.

References Cited (Backward Citations)

US2089306A Cited
US2417049A Cited
US2432885A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1953-12-11 1954-06-12 1954-12-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1957-12-11 1958-06-12 1958-12-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1961-12-11 1962-06-12 1962-12-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag