Snow melting method
Abstract
Abstract PURPOSE: To build a snow melting pavement surface rapidly and at a low-cost by a method wherein a snow melting panel formed that cobble gravel is buried on a surface, a hot water pipe near a surface layer, and reinforcing bars near a lower layer are laid on a road surface, the hot water pipes are coupled together. CONSTITUTION: A snow melting panel 15 consists of a hot water pipe 2 buried near a panel body 1 and a body surface; reinforcing bars 3 buried on the panel surface side; and a surface layer consisting of cobble gravel 10. The snow melting panels are laid on a road surface, two end parts 5 of the hot water pipe 2 of the laid snow melting panel 15 are coupled together, and recessed part 7 is filled with mortar to form a pavement surface. This constitution lays a hot water pipe rapidly and simply.
Inventors
- 👤 Jun Ishii
- 👤 Minoru Mabuchi
- 👤 Tadao Kenmochi
- 👤 Hiroyuki Ueda
Bibliographic Details
Claims Analysis
Total Claims: 0References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
Maintenance schedule is calculated for granted US utility patents.