Composite production system
Abstract
Abstract PURPOSE: To reduce the time and the number of transfer times per process and make it easy to contract or expand the scale of a system by disposing partially different processes at the same position and standardizing constituting units. CONSTITUTION: In an information processing system SS1, the technical sides of a product specification 101 are embodied in succession in the order of product design 102, process design 103 and work design 104 and these technical informations are supplied to a product production system SS3 as the first group command information called production process 109. Also in the system SS1, the control sides of the product specification 101 are embodied in the order of production plan 105, load plan 106, layout plan 107 and daily plan 108 and they are supplied to the system SS3 and a production control system SS2 as the second group command information called production schedule. And production control command information 111 is supplied from the SS2 to the SS3 and production result information 112 is supplied from the SS3 to the SS2. COPYRIGHT: (C)1981,JPO&Japio
Inventors
- 👤 Shotaro Ozaki
- 👤 Masayuki Iwamatsu
- 👤 Hiroya Kimura
- 👤 Kinya Shirakawa
- 👤 Sadaaki Nanai
- 👤 Tatsuji Wada
Bibliographic Details
Claims Analysis
Total Claims: 0References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
Maintenance schedule is calculated for granted US utility patents.