← Back to Patent Explorer
JPS5498480A Expired / Lapsed JP ⏱️ 0.0 years remaining

Sequence control method

Assignee: Toshiba Corp
•
Filing: 1978-01-19
•
Granted: —
•
Expires: 1998-01-19
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract PURPOSE: To reduce the action required time of the sequence control in the stored program system, by executing a proper sequence detected from groups of condition with the sequence divided into several sections according to the order of control. CONSTITUTION: The sequence in the drawing A is divided into six sequential sections respectively covering the time until an output valve opening command relay 21S starts operation, a guide valve opening control command relay 65S starts operation, ... and finally a load control command relay 43 WLR starts operation. At the same time, the return time of a start initiating relay BR is set at the SEQ 2-0 and let to be memorized with a memory as shown in the drawing 3. A branch execution symbol BR is provided to check conditions as to whether AND is established or not in the branch and specifies a proper address, whereby selection is made from the sequential sections SEG 2-0, SEG 1-1 ... and SEQ 1-5. Accordingly, execution of only one of sequential sections from SEQ 2-0 to 1-5 suffices for the purpose, thus eliminating the trouble of executing the whole sequence as in the past. COPYRIGHT: (C)1979,JPO&Japio

Inventors

  • 👤 Tadahiro Yanagisawa
  • 👤 Matsuo Yamazaki

Bibliographic Details

Application Number —
Jurisdiction JP
Data Source google_patents
Last Synchronized 2026-11-04 07:01
CPC Classifications
—

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag