← Back to Patent Explorer
EP0840141A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

Well logging data interpretation

Assignee: Western Atlas International Inc
•
Filing: 1997-10-28
•
Granted: —
•
Expires: 2017-10-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method for producing synthetic tool responses for a well logging tool for an earth formation, the method including, in one aspect, generating wellbore logging data for a particular part of an earth formation with a wellbore logging system with a wellbore logging tool, the earth formation having at least one layer, producing an input earth model of the particular part of the earth formation based on the wellbore logging data, inputting the input earth model to a trained artificial neural network, e.g. )resident in a computer, the computer with the trained artificial neural network processing the input earth model and producing synthetic tool responses for the wellbore logging tool for one point or for a plurality of points in the earth formation.

Inventors

  • 👤 Alberto G. Mezzatesta
  • 👤 Michael A. Jervis
  • 👤 David R. Beard
  • 👤 Kurt-M. Strack
  • 👤 Leonty A. Tabarovksy

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-10-25 22:10
CPC Classifications
G; G01; G01V; G01V3/00; G01V3/38; G01V1/00; G01V1/28; G01V1/282; G01V1/40; G01V1/44; G01V1/48; G01V1/50; E; E21; E21B; E21B2200/00; E21B2200/22; G01V2210/00; G01V2210/60; G01V2210/61; G01V2210/614

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 105 words
A method for forward modeling to produce synthetic tool responses for a well logging tool for an earth formation having at least one layer, the well logging tool disposed in a wellbore in the earth formation, the method comprising producing an input earth model of the earth formation based on the wellbore logging data, inputting the input earth model to a primary trained artificial neural network, processing the input earth model with the primary trained artificial neural network to produce an output model that includes a set of synthetic tool responses for the wellbore logging tool for at least one point in the earth formation.
Claim 2
Dependent Claim 37 words
The method of claim 1 wherein the wellbore logging data is data from the group consisting of electrical resistivity data, acoustic data, seismic data, vertical seismic profiling data, magnetic data, gravimetric data, temperature data, and nuclear data.
Claim 3
Dependent Claim 20 words
The method of claim 1 wherein the at least one point in the earth formation is a plurality of points.
Claim 4
Dependent Claim 35 words
The method of claim 1 wherein the at least one layer of the earth formation is a plurality of layers and the at least one point in the earth formation is a plurality of points.
Claim 5
Dependent Claim 132 words
The method of claim 1 wherein the primary trained artificial neural network is produced by a method comprising training a first artificial neural network with an input training set, the input training set comprising a plurality of earth models based on wellbore logging data and further comprising a set of wellbore logging tool responses associated with each earth model, producing a first trained artificial neural network, producing a first output set of synthetic tool responses for the well logging tool with the first trained artificial neural network, inputting to a second artificial neural network both the input earth model training set and the first output set of synthetic tool responses for the well logging tool, producing a second trained artificial neural network which then serves as the primary trained artificial neural network.
Claim 6
Dependent Claim 129 words
The method of claim 1 further comprising comparing the wellbore logging data to the synthetic tool responses of the output model to determine amount of mismatch between them, if the mismatch is acceptable, saving the output model for subsequent use, and if the mismatch is not acceptable, further training the primary trained artificial neural network producing a secondary trained artificial neural network and producing therewith a secondary output model that includes a set of secondary synthetic tool responses, and comparing the wellbore logging data to the set of secondary synthetic tool responses to determine amount of mismatch between them, if the mismatch is acceptable, saving the secondary output model, and if the mismatch is not acceptable again training the secondary artificial neural network producing a tertiary artificial neural network.
Claim 7
Dependent Claim 13 words
The method of claim 6 wherein acceptable mismatch is no more than 40%.
Claim 8
Dependent Claim 13 words
The method of claim 6 wherein acceptable mismatch is no more than 10%.
Claim 9
Dependent Claim 39 words
The method of claim 6 wherein the primary trained artificial neural network has a plurality of nodes and the further training of the primary trained artificial neural network comprises optimizing the nodes of the primary trained artificial neural network.
Claim 10
Dependent Claim 12 words
The method of claim 9 wherein the nodes are optimized by backpropagation.
Claim 11
Dependent Claim 138 words
The method of claim 5 further comprising comparing the wellbore logging data to the synthetic tool responses of a secondary output model produced by the second trained artificial neural network to determine amount of mismatch between them, if the mismatch is acceptable, saving the secondary output model, and if the mismatch is not acceptable, further training the second trained artificial neural network producing a tertiary trained artificial neural network and producing therewith a tertiary output model that includes a set of tertiary synthetic tool responses, and comparing the wellbore logging data to the tertiary set of tool responses to determine amount of mismatch between them, if the mismatch is acceptable, saving the tertiary output model for subsequent use, and if the mismatch is not acceptable again training the tertiary artificial neural network producing a fourth artificial neural network.
Claim 12
Dependent Claim 13 words
The method of claim 11 wherein acceptable mismatch is no more than 255%.
Claim 13
Dependent Claim 13 words
The method of claim 11 wherein acceptable mismatch is no more than 1.5%.
Claim 14
Dependent Claim 39 words
The method of claim 11 wherein the secondary trained artificial neural network has a plurality of nodes and the further training of the secondary trained artificial neural network comprises optimizing the nodes of the secondary trained artificial neural network.
Claim 15
Dependent Claim 13 words
The method of claim 14 wherein the nodes are optimized by back 5propagation.
Claim 16
Dependent Claim 29 words
The method of claim 1 wherein the method is conducted at a well site having a wellbore extending into the formation, the wellbore logging tool disposed in the wellbore.
Claim 17
Dependent Claim 21 words
The method of claim 16 further comprising conducting a subsequent wellbore operation at the well site based on the output model.
Claim 18
Dependent Claim 79 words
The method of claim 17 wherein the subsequent wellbore operation is from the group consisting of perforating casing lining the wellbore to produce hydrocarbons from the formation; drilling deeper in the formation; drilling at least one lateral bore from the wellbore; plugging and abandoning the wellbore; and removing the wellbore logging tool from the wellbore and then running at least one additional wellbore tool into the wellbore and using said at least one additional wellbore tool in the wellbore.
Claim 19
Independent Claim 236 words
A method for forward modeling to produce synthetic tool responses for a well logging tool for an earth formation having a plurality of layers, the wellbore logging tool in a wellbore in the earth formation and generating wellbore logging data for a particular part of the earth formation from the group consisting of electrical resistivity data, acoustic data, vertical seismic profiling data, magnetic data, gravimetric data, temperature data, and nuclear data, the method comprising producing an input earth model of the particular part of the earth formation based on the wellbore logging data, inputting the input earth model to a primary trained artificial neural network, processing the input earth model with the primary trained artificial neural network to produce an output model that includes a set of synthetic tool responses for the wellbore logging tool for a plurality of points in the earth formation, the primary trained artificial neural network produced by training a first artificial neural network with an input training set producing a first trained artificial neural network, producing a first output set of synthetic tool responses for the well logging tool with the first trained artificial neural network, and inputting to a second artificial neural network both the input earth model training set and the first output set of synthetic tool responses for the well logging tool, producing a second trained artificial neural network which serves as the primary trained artificial neural network.
Claim 20
Dependent Claim 135 words
The method of claim 19 further comprising comparing the wellbore logging data to the synthetic tool responses of the output model to determine amount of mismatch between them, if the mismatch is no more than 5%, saving the primary trained artificial neural network for subsequent use, and if the mismatch is not acceptable, further training the primary trained artificial neural network producing a secondary trained artificial neural network and producing therewith a secondary output model that includes a set of secondary synthetic tool responses, and comparing the wellbore logging data to the secondary set of tool responses to determine amount of mismatch between them, and if the mismatch is acceptable, saving the secondary output model, and if the mismatch is not acceptable again training the secondary artificial neural network producing a tertiary artificial neural network.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag