← Back to Patent Explorer
EP0825794A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

A network flow framework for online dynamic channel allocation

Assignee: Nokia of America Corp
•
Filing: 1997-08-12
•
Granted: —
•
Expires: 2017-08-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The invention relates to a dynamic channel allocation system for a mobile communication system wherein mobile units communicate with the base station on allotted channels. The channel allocations are determined according to a framework of network flows including flow paths with nodes representing active mobile units, base stations and channels used for communication between active mobile units and their respective base stations. A new call from a mobile unit is added by finding the shortest available augmenting path for the added unit. The edges between nodes can include cost and capacity factors which can be used to determine desirable reconfigurations for the network.

Inventors

  • 👤 Prathima Agrawal
  • 👤 Narayanan Shivakumar
  • 👤 Balakrishnan Narendran

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-08 02:54
CPC Classifications
H; H04; H04W; H04W16/00; H04W16/02; H04W16/10; H04W72/00; H04W72/04; H04W76/00; H04W76/10

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 156 words
A method for dynamic channel allocation in a mobile communication system wherein mobile units communicate with base stations on allotted channels, including the steps of: creating a framework for network flows including flowpaths between nodes representing active mobile units, nodes representing base stations, and nodes representing channels used between active mobile units and their respective base stations; admitting a new call from a mobile unit being added by finding augmenting flowpaths in said framework, each such augmenting flowpath passing through an added node for said mobile unit being added, a node for an available base station, and one or more nodes for channels available for communicating between said added mobile unit and said available base stations; said augmenting flowpaths including reverse flow paths corresponding to reassignments of channels or base stations; and allocating a channel to said new mobile unit being added according to the shortest augmenting path through said node for the mobile being added.
Claim 2
Dependent Claim 33 words
A dynamic channel allocation system according to claim 1 including a quality factor in each flow path and wherein the flow path allocated for an added mobile unit is highest quality channel available.
Claim 3
Dependent Claim 20 words
A dynamic channel allocation system according to claim 2 wherein said quality factor is determined according to noise between channels.
Claim 4
Dependent Claim 41 words
A dynamic channel allocation system according to claim 1 wherein cost factors are included in the flow paths between nodes and the addition of a new mobile is blocked where an augmenting path below a predetermined cost threshold is not found.
Claim 5
Dependent Claim 40 words
A dynamic channel allocation system according to claim 1 wherein an augmenting path that requires a channel reassignment includes a reverse flow from the node of the channel being reassigned to the node for the mobile having its channel reassigned.
Claim 6
Dependent Claim 44 words
A dynamic channel allocation system according to claim 1 wherein an augmenting path that involves a base station reassignment includes a reverse flow according to the base station reassignment and a reverse flow according to the channel reassignment necessitated by the base station reassignment.
Claim 7
Independent Claim 77 words
A method for dynamic channel allocation in a mobile communication system wherein mobile units communicate with base stations on allotted channels, including the steps of: creating a framework for network flows including flowpaths between nodes representing active mobile units, nodes representing base stations, and nodes representing channels used between active mobile units and their respective base stations; each of said flowpaths including cost factors; and reconfiguring said systems by reassigning channels that result in flowpath cost reductions.
Claim 8
Dependent Claim 18 words
The method for dynamic channel allocation according to claim 7 wherein said reconfigurations take place following call terminations.
Claim 9
Dependent Claim 28 words
The method for dynamic channel allocation according to claim 7 wherein said reconfiguration takes place following handoffs when a mobile unit is transferred to a different base station.
Claim 10
Dependent Claim 21 words
The method for dynamic channel allocation according to claim 7 wherein said reconfiguration takes place in response to signal quality deterioration.
Claim 11
Dependent Claim 17 words
The method for dynamic channel allocation according to claim 7 wherein said cost factors include interchannel noise.
Claim 12
Independent Claim 96 words
A method for performing dynamic channel allocation in a mobile communication system wherein mobile units communicate with base stations on alloted channels, the method including the steps of: creating a framework for network flows based on an initial state of said mobile communication system, the framework including one or more flowpaths; admitting a new call from a mobile unit being added by determining one or more augmenting flowpaths in said framework modified to reflect the mobile unit being added; and allocating a channel to said new mobile unit being added based on the determined augmenting flowpaths.
Claim 13
Dependent Claim 32 words
The method according to claim 12 wherein said framework for network flows includes nodes for an active mobile unit, a base station and an allocated channel in each of said network flows.
Claim 14
Dependent Claim 13 words
The method according to claim 12 wherein said augmenting flowpaths include reverse flowpaths.
Claim 15
Independent Claim 81 words
A method for performing dynamic channel allocation in a mobile communication system wherein mobile units communicate with base stations on allotted channels, the method including the steps of: creating a framework for network flows based on a state of said mobile communication system, the framework including one or more flowpaths, each of said flowpaths including one or more cost factors; and reconfiguring the state of said mobile communication system by reassigning channel assignments so as to result in flowpath cost reductions.
Claim 16
Dependent Claim 33 words
The method according to claim 15 wherein said framework for network flows includes a node for an active mobile unit, a base station and an allocated channel in each of said network flows.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag