← Back to Patent Explorer
EP0778069A1 Expired / Lapsed EP ⏱️ 0.0 years remaining

Reactive purge for solid electrolyte membrane gas separation

Assignee: Praxair Technology Inc
•
Filing: 1996-12-04
•
Granted: —
•
Expires: 2016-12-04
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A system and process for producing a high-purity product from a feed stream containing elemental oxygen by applying the feed stream to at least one separator including a feed zone and a permeate zone separated by a solid electrolyte membrane, and driving a portion of oxygen contained in the feed stream from the feed zone to the permeate zone via the membrane by applying to the permeate zone a reactive purge stream containing a reactive gas which combines with oxygen to establish a lower partial pressure of oxygen in that zone. Oxygen-depleted retentate is withdrawn as a high-purity product stream.

Inventors

  • 👤 Ravi Prasad
  • 👤 Christian Friedrich Gottzmann
  • 👤 Nitin Ramesh Keskar

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-05 20:20
CPC Classifications
B; B01; B01D; B01D53/00; B01D53/22; B01D53/225; B01D53/226; B01D53/32; B01D53/326; C; C01; C01B; C01B13/00; C01B13/02; C01B13/0229; C01B13/0248; C01B13/0251; B01D2257/00; B01D2257/10; B01D2257/104

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 126 words
A process for producing a high-purity product from a feed stream containing elemental oxygen, comprising: applying said feed stream to a first separator including a first feed zone and a first permeate zone separated by a first solid electrolyte membrane capable of transporting oxygen ions; driving a first portion of oxygen contained in said feed stream from said first feed zone to said first permeate zone through said first membrane by applying a reactive purge stream to said first permeate zone, said reactive purge stream including a reactive gas that combines with oxygen to establish a lower partial pressure of oxygen in said first permeate zone; and obtaining an oxygen-depleted product stream after the first portion of oxygen has been driven from said first feed zone.
Claim 2
Dependent Claim 15 words
The process of claim 1 wherein said reactive purge stream includes an oxygen-depleted diluent component.
Claim 3
Dependent Claim 20 words
The process of claim 1 wherein said reactive purge stream includes a portion of output from said first feed zone.
Claim 4
Dependent Claim 26 words
The process of claim 1 further including directing at least a portion of output from said first permeate zone to mix with said reactive purge stream.
Claim 5
Dependent Claim 116 words
The process of claim 1 further including positioning said first separator as a second stage and initially applying said feed stream to a second feed zone of at least a second separator, said second separator being positioned as a first stage and having a second permeate zone separated from said second feed zone by a second solid electrolyte membrane; driving a second portion of oxygen, which is contained in said feed stream, from said second feed zone to said second permeate zone through said second membrane; and directing an oxygen-depleted feed stream, obtained after the second portion of oxygen has been driven from said second feed zone, to said first feed zone of said first separator.
Claim 6
Dependent Claim 60 words
The process of claim 5 wherein said reactive purge stream applied to said first permeate zone includes an oxygen-depleted diluent component that is selected to accomplish at least one of decreasing the rate at which said reactive gas combines with the oxygen, controlling temperature rise in said first separator, and rendering chemical conditions with said first permeate zone less reducing.
Claim 7
Dependent Claim 46 words
The process of claim 6 wherein the step of driving oxygen for at least one of said first and second separators includes diverting a portion of output from at least one of said first and second feed zones to purge the permeate zone of that separator.
Claim 8
Dependent Claim 20 words
The process of claim 7 wherein at least one of said first and second membranes includes a mixed conduction material.
Claim 9
Dependent Claim 35 words
The process of claim 8 wherein said first membrane in said second stage is an ionic membrane, and the step of driving for said first separator includes providing an electrical connection across said first membrane.
Claim 10
Dependent Claim 27 words
The process of claim 5 further including directing a purge stream from an outlet of said first permeate zone to an inlet of said second permeate zone.

References Cited (Backward Citations)

EP0399833A1 Cited
US5306411A Cited
US5035726A Cited
US5160713A Cited
US5205842A Cited

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag