← Back to Patent Explorer
EP0372961A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

Add/shed load control using anticipatory processes

Assignee: Honeywell Inc
•
Filing: 1989-12-07
•
Granted: —
•
Expires: 2009-12-07
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract An add/shed system 10 to maintain the power consumption of a building below the predetermined level includes a plurality of loads A,B,C,D and means 38 for measuring the present total power consumption of the building. Processor 12 and computations section 40 reactively shed selected ones of the loads responsive to the measured total power consumption of the building to maintain the present power consumption of the building below the predetermined level. Processor 12 and anticipatory control section 42 determine the anticipated future increase or decrease in power consumption of the building and add or shed selected ones of the loads responsive to the measured total power consumption of the building and the anticipated future increase or decrease in power consumption of the building for continuously maintaining the power consumption of the building below the predetermined level.

Inventors

  • 👤 Charles H. Culp Iii

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-08 06:49
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/12; H02J3/14; H02J2105/00; H02J2105/50; H02J2105/52; H02J2105/57; Y; Y02; Y02B; Y02B70/00; Y02B70/30; Y02B70/3225; Y04; Y04S; Y04S20/00; Y04S20/20; Y04S20/222

Claims Analysis

Total Claims: 25
Claim 1
Independent Claim 189 words
An add/shed system for adding/shedding loads to maintain the power consumption of a building below a predetermined level, said system characterised by: a plurality of loads (A,B,C,D); measuring means (38) for measuring the present total power consumption of said building; first means (12,40) for shedding selected ones of said loads responsive to said measured present total power consumption of said building to maintain the present power consumption of said building below said predetermined level; and second means (12,42) for determining the anticipated future increase or decrease in power consumption of said building and for adding/shedding selected ones of said loads responsive to said measured present total power consumption of said building and said anticipated future increase or decrease in power consumption of said building for continuously maintaining the power consumption of said building below said predetermined level, wherein said second means is arranged to determine the anticipated future increase or decrease in power consumption by determining which of said loads will be required on or off during a preselected time interval and by determining which of said loads will be requested on or off during a preselected time interval.
Claim 2
Dependent Claim 189 words
An add/shed system for adding/shedding loads to maintain the power consumption of a building below a predetermined level, said system characterised by: a plurality of loads (A,B,C,D); measuring means (38) for measuring the present total power consumption of said building; first means (12,40) for shedding selected ones of said loads responsive to said measured present total power consumption of said building to maintain the present power consumption of said building below said predetermined level; and second means (12,42) for determining the anticipated future increase or decrease in power consumption of said building and for adding/shedding selected ones of said loads responsive to said measured present total power consumption of said building and said anticipated future increase or decrease in power consumption of said building for continuously maintaining the power consumption of said building below said predetermined level, wherein said second means is arranged to determine the anticipated future increase or decrease in power consumption by determining which of said loads will be required on or off during a preselected time interval and by determining which of said loads will be requested on or off during a preselected time interval.
Claim 3
Dependent Claim 43 words
A system according to Claim 1 characterised in that said system (10) is arranged to shed loads (A, B, C, D) when the power consumption of said building reaches a second predetermined level, said second predetermined level being less than said predetermined level.
Claim 4
Dependent Claim 45 words
A system according to Claim 1 or Claim 2 characterised in that said system (10) is arranged to add loads (A,B,C,D) when the power consumption of said building falls to a third predetermined level, said third predetermined level being less than said second predetermined level.
Claim 5
Independent Claim 65 words
A system according to any preceding Claim characterised in that said system (10) adds/sheds loads (A,B,C,D) during each of a plurality of successive discreet time intervals, and wherein said second means (12,42) is arranged to determine the anticipated future increase or decrease in power consumption by determining which of said loads will be required or requested on or off during the next successive time interval.
Claim 6
Independent Claim 56 words
A system according to any preceding Claim characterised in that said second means (12,42) is arranged for reactively shedding loads (A,B,C,D) based upon power consumption in a present time interval and for predictively adding/shedding loads (A,B,C,D) in the next time interval based upon anticipated increases or decreases in power consumption determined in said present time interval.
Claim 7
Independent Claim 43 words
A system according to any preceding Claim characterised in that said second means (12,42) is arranged for delaying the adding of a given load (A,B,C,D) until said given load can be added without the power consumption of said building exceeding said predetermined level.
Claim 8
Independent Claim 42 words
A system according to any preceding Claim characterised in that each of said loads (A,B,C,D) is assigned a priority with respect to each of the other loads and wherein said first and second means adds/sheds said loads in accordance with said priorities.
Claim 9
Dependent Claim 47 words
A system according to Claim 7 characterised in that one or more of said loads (A,B,C,D) are combined in a group of loads having a given priority and wherein each load of said group is assigned a priority with respect to each other load of said group.
Claim 10
Independent Claim 61 words
A system according to any preceding Claim characterised in that each said load (A,B,C,D) is assigned to at least one of multiple types of add/shed sequences, each sequence controlling the adding/shedding of said loads in a different order, and wherein said system includes means for determining which type of the multiple types of add/shed sequence is assigned to each said load.
Claim 11
Dependent Claim 26 words
A system according to Claim 9 characterised in that said second means (12,42) is further arranged for adding/shedding each load (A,B,C,D) according to its assigned sequence.
Claim 12
Independent Claim 62 words
A system according to any preceding Claim characterised in that said system adds/sheds loads (A,B,C,D) during each of a plurality of successive discreet time intervals, and said second means (12,42) is arranged to determine the anticipated future increase or decrease in power consumption by determining which of said loads will be required or requested on or off during a present time interval.
Claim 13
Dependent Claim 51 words
A system according to Claim 11 characterised in that said second means (12,42) is arranged for reactively shedding loads based upon power consumption in a present time interval and for adding/shedding loads during said present time interval based upon anticipated power consumption decreases or increases determined in said present time interval.
Claim 14
Dependent Claim 189 words
An add/shed system for adding loads by an ON command for each said load and shedding loads by an OFF command for each said load to maintain the energy consumption of a building below a predetermined level, each load being assigned to at least one of multiple types of add/shed routines, each routine controlling the adding and shedding of said loads in a different sequence, said system c.b: a plurality of loads (A,B,C,D); and processor means (12) connected to said plurality of loads and adapted to be connected to a power meter (38) for determining which of said plurality of loads should be added or shed to maintain the energy consumption of said building below said predetermined level and for determining which type of the multiple types of add/shed routines is assigned to each load, said processor means for adding or shedding each load according to its assigned routine, said processor means also including means for determining in advance of a load ON command for a given load when the adding of said given load will cause the energy consumption of said building to increase above said predetermined level.
Claim 15
Dependent Claim 189 words
An add/shed system for adding loads by an ON command for each said load and shedding loads by an OFF command for each said load to maintain the energy consumption of a building below a predetermined level, each load being assigned to at least one of multiple types of add/shed routines, each routine controlling the adding and shedding of said loads in a different sequence, said system c.b: a plurality of loads (A,B,C,D); and processor means (12) connected to said plurality of loads and adapted to be connected to a power meter (38) for determining which of said plurality of loads should be added or shed to maintain the energy consumption of said building below said predetermined level and for determining which type of the multiple types of add/shed routines is assigned to each load, said processor means for adding or shedding each load according to its assigned routine, said processor means also including means for determining in advance of a load ON command for a given load when the adding of said given load will cause the energy consumption of said building to increase above said predetermined level.
Claim 16
Dependent Claim 103 words
A system according to Claim 13 characterised in that said processor means (12) is further adapted for determining the increase in energy consumption of said building represented by said given load in advance of said ON command for said given load and for shedding one or more of the other loads having a total energy consumption at least equal to the increase in energy consumption of said building represented by said given load prior to said ON command for said given load to eliminate said increase in energy consumption of said building represented by said given load when said given load is added.
Claim 17
Dependent Claim 95 words
A system according to Claim 13 or 14 characterised in that said loads (A,B,C,D) subject to said ON and OFF commands comprise controlled loads, wherein said system further includes non-controlled loads, and wherein said processor (12) is further adapted to monitor the total energy consumption of said building for determining when one or more of said non-controlled loads cause the energy consumption demand of said building to exceed a predetermined level and for shedding one or more of said controlled loads to reduce the energy consumption demand of said building to below said predetermined level.
Claim 18
Independent Claim 40 words
A system according to any of Claims 13 to 15 characterised in that said processor (12) is further adapted to delay the ON command for a given load to maintain the energy consumption of said building below said predetermined level.
Claim 19
Independent Claim 76 words
A system according to any of the preceding Claims characterised by: a second plurality of loads; control means for controlling the turning on and turning off of said second plurality of loads; wherein said second means is further arranged to alter the control of said second plurality of loads by said control means when the turning on of said second plurality of loads would cause the power consumption of said building to exceed said predetermined level.
Claim 20
Dependent Claim 35 words
According to Claim 17 characterised in that said control means is arranged to transmit a request to said second means (12,42) prior to the turning on or turning off of said second plurality of loads.
Claim 21
Independent Claim 163 words
A method of adding/shedding selected ones of a plurality of loads to maintain the power consumption of a building below a predetermined level, said method characterised by the steps of: measuring the present total power consumption of said building; reactively shedding selected ones of said loads (A,B,C,D) responsive to said measured present total power consumption of said building to maintain the present power consumption of said building below said predetermined level; determining the anticipated future increase or decrease in power consumption of said building by determining which of said loads will be required on or off during a preselected time interval and by determining which of said loads will be requested on or off during a preselected time interval; predictively adding/shedding selected ones of said loads responsive to said measured present total power consumption of said building and said anticipated future increase or decrease in power consumption of said building to continuously maintain the power consumption of said building below said predetermined level.
Claim 22
Independent Claim 163 words
A method of adding/shedding selected ones of a plurality of loads to maintain the power consumption of a building below a predetermined level, said method characterised by the steps of: measuring the present total power consumption of said building; reactively shedding selected ones of said loads (A,B,C,D) responsive to said measured present total power consumption of said building to maintain the present power consumption of said building below said predetermined level; determining the anticipated future increase or decrease in power consumption of said building by determining which of said loads will be required on or off during a preselected time interval and by determining which of said loads will be requested on or off during a preselected time interval; predictively adding/shedding selected ones of said loads responsive to said measured present total power consumption of said building and said anticipated future increase or decrease in power consumption of said building to continuously maintain the power consumption of said building below said predetermined level.
Claim 23
Dependent Claim 36 words
A method according to Claim 19 characterised in that said loads (A,B,C,D) are shed when the power consumption of said building reaches a second predetermined level, said second predetermined level being less than said predetermined level.
Claim 24
Dependent Claim 45 words
A method according to Claim 20 characterised in that said loads (A,B,C,D) are added when the power consumption of said building falls to a third predetermined level, said third predetermined level being less than said second predetermined level being less that said second predetermined level.
Claim 25
Independent Claim 63 words
A method according to any of Claims 19 to 21 characterised in that said loads (A,B,C,D) are added or shed during each of a plurality of successive discreet time intervals, and wherein the anticipated future increase or decrease in power consumption is determined by determining which of said loads will be required or requested on or off during the next successive time interval.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag