← Back to Patent Explorer
EP0223300A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

Gas meter

Assignee: EMS Holland BV
•
Filing: 1986-11-11
•
Granted: —
•
Expires: 2006-11-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Method for the measurement of gas quantities which flow through an inlet opening (1) and device for the implementation of that method, whereby the gas is conducted through a block (2) of binary clack valves which are connected in parallel with maximum passage capacities which differ from one another, whereby the total drop of pressure across the block (2) is maintained at a pre-determined value by continuously detecting deviations from this value with a pressure detector (3) which controls a regulation system (4) with the signals which correspond therewith, which, depending on the signals which are received, opens and/or closes clacks in valves, after which the volume flow is read-off from the position of the valves. The device is preferably equipped with a precision adjustment for the drop of pressure, with correction sensors for temperature and pressure of the gas, and with a microprocessor which measures the gas quantities.

Inventors

  • 👤 A. Kramer

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-03 21:06
CPC Classifications
G; G01; G01F; G01F1/00; G01F1/05; G01F1/34; G01F1/36; G01F1/40; G01F1/20; G01F1/22; G01F1/50

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 108 words
Method for measuring gas quantities which flow through an inlet opening (1), characterised in that the gas is passed through a block (2) of binary clack valves which are connected in parallel with maximum passage capacities which differ from one another, whereby the total drop of pressure across the block (2) is maintained at a pre-determined value by continuously detecting deviations from this value with a pressure detector (3) which controls a regulation system (4) with the signals which correspond therewith, which, depending on the signals which are received, opens and/or closes clacks in valves, after which the volume flow is read-off from the position of the valves.
Claim 2
Dependent Claim 108 words
Method for measuring gas quantities which flow through an inlet opening (1), characterised in that the gas is passed through a block (2) of binary clack valves which are connected in parallel with maximum passage capacities which differ from one another, whereby the total drop of pressure across the block (2) is maintained at a pre-determined value by continuously detecting deviations from this value with a pressure detector (3) which controls a regulation system (4) with the signals which correspond therewith, which, depending on the signals which are received, opens and/or closes clacks in valves, after which the volume flow is read-off from the position of the valves.
Claim 3
Dependent Claim 52 words
Method according to claim 1, characterised in that the precision adjustment of the pressure drop for very small quantities of gas is obtained by adjusting the passage capacity of the valve with the smallest maximum passage capacity via a clack which can be continuously adjusted between an open and a closed position.
Claim 4
Dependent Claim 60 words
Method according to claim 1 or 2, characterised in that for determining the weight quantities of a gas which has flown through an opening (1) the temperature of the gas and the pressure of the gas in the supply pipe are determined with the aid of sensors, with the aid of which the details on the volume flow are corrected.
Claim 5
Dependent Claim 17 words
Method according to claim 3, characterised in that the correction is carried out with a micro- processor.
Claim 6
Dependent Claim 37 words
Method according to claim 4, characterised in that for determining the heat content of the quantity of gas which has flown through an opening (1) the micro- processor is adjusted according to the composition of the gas.
Claim 7
Dependent Claim 81 words
Device for the implementation of the method according to claim 1, characterised in that it contains a block (2) of binary adjustable clack valves which are connected in parallel with maximum passage capacities which differ from one another behind the inlet (1), a pressure detector (3) for measuring the differences which occur in the drop of pressure across the block (2), coupled with a system (4) which, controlled by these differences in drop of pressure, adjusts the position of the clacks.
Claim 8
Dependent Claim 36 words
Device according to claim 6, for the implementation of the method according to claim 2, characterised in that the clack of the valve with the smallest maximum passage capacity is continuously adjustable between open and closed.
Claim 9
Dependent Claim 49 words
Device according to claim 6 or 7, for the implementation of the method according to claim 3, characterised in that it is equipped with a temperature sensor and with a pressure sensor in the supply pipe, both coupled with the part of the device which measures the gas quantities.
Claim 10
Dependent Claim 21 words
Device according to claim 8, characterised in that the part of the device which measures the gas quantities is a micro-processor.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag