← Back to Patent Explorer
EP0174641A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

A process for recovering valuable metals from an iron dust containing a higher content of zinc

Assignee: Sumitomo Heavy Industries Ltd
•
Filing: 1985-09-10
•
Granted: —
•
Expires: 2005-09-10
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A process for recovering valuable metals from an iron dust with a high concentration of zinc comprising (1) pelletizing said dust into a pellet in a pelletizer, (2) preheating the resulting pellets by charging a hot gas to remove water, the loss on ignition and carbonaceous materials contained in the pellets, and in case of need, the conditions of gas charged are set up so as to reduce selectively iron oxide while controlling the reduction of zinc oxide practically at zero level, (3) melting and reducing zinc oxide, iron oxide and lead oxide in said pellets in an induction furnace to separate zinc and a part of lead by vaporization and iron and lead by means of the difference in their specific gravities, and collecting zinc and lead as crude ones, iron as molten pig iron and lead as crude one respectively.

Inventors

  • 👤 Toshio Matsuoka
  • 👤 Shinichi Kurozu

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-10-23 22:13
CPC Classifications
C; C22; C22B; C22B19/00; C22B19/04; C21; C21B; C21B3/00; C21B3/04; C22B1/00; C22B1/14; C22B1/24; C22B1/2406; C22B13/00; C22B13/02; C22B5/00; C22B5/02; C22B5/10; C22B5/16; C22B7/00; C22B7/02; Y; Y02; Y02P; Y02P10/00; Y02P10/20; Y02W; Y02W30/00; Y02W30/50

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 177 words
A process for recovering valuable metals from an iron dust containing zinc at a high concentration therein comprising: (1) pelleting the dust into pellets with a pelletizer 1; (2) preheating the pellets in a shaft type furnace 2 for drying them, removing the loss on ignition and burning solid carbonaceous materials in the pellets to remove the materials by means of charging a hot gas from a furnace 8; (3) charging the resulting pellets into an induction furnace 3 together with a carbonaceous solid reductant; (4) melting and reducing iron oxide, zinc oxide and lead oxide contained in said pellets in the furnace 3 with the solid reductant so that reduced zinc and a part of reduced lead are vaporized and sent to a condenser 5; (5) separating zinc and lead in a gaseous state by condensing them by the condenser 5 to obtain crude zinc and lead; and (6) separating iron and lead by means of the difference of their specific gravities to obtain molten pig iron and crude lead in the induction furnace 3, respectively.
Claim 2
Dependent Claim 177 words
A process for recovering valuable metals from an iron dust containing zinc at a high concentration therein comprising: (1) pelleting the dust into pellets with a pelletizer 1; (2) preheating the pellets in a shaft type furnace 2 for drying them, removing the loss on ignition and burning solid carbonaceous materials in the pellets to remove the materials by means of charging a hot gas from a furnace 8; (3) charging the resulting pellets into an induction furnace 3 together with a carbonaceous solid reductant; (4) melting and reducing iron oxide, zinc oxide and lead oxide contained in said pellets in the furnace 3 with the solid reductant so that reduced zinc and a part of reduced lead are vaporized and sent to a condenser 5; (5) separating zinc and lead in a gaseous state by condensing them by the condenser 5 to obtain crude zinc and lead; and (6) separating iron and lead by means of the difference of their specific gravities to obtain molten pig iron and crude lead in the induction furnace 3, respectively.
Claim 3
Dependent Claim 85 words
A process for recovering valuable metals according to claim 1 wherein the shaft type furnace 2 is the one having a preheating zone in its upper part, and having a prereducing zone in its lower part in which the prereducing is conducted in such gas conditions that the reduction of iron oxide is selectively carried out but the reduction of zinc oxide is controlled as low as possible by means of charging the hot gas from the furnace 8 which can regulate said gas conditions.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag