← Back to Patent Explorer
EP0153035A1 Expired / Lapsed EP ⏱️ 0.0 years remaining

Flow control apparatus for liquid delivery system

Assignee: Sharp Corp
•
Filing: 1985-01-25
•
Granted: —
•
Expires: 2005-01-25
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A host processor (1 A) stores a preset delay time data (T), corresponding to the time taken from the initiation of a delivery operation for liquid to start being delivered from a delivery nozzle (28). During delivery,the amount of liquid delivered is measured by a sub-processor (1B) using flow-rate pulses. When a delivery nozzle (28) is activated, it sends a signal to the sub-processor (1 B). The sub-processor then obtains the preset delay time data (T) from the host processor and does not count flow-rate pulses during the delay time. This improves the sub-processor's measurement of the liquid delivery, since it avoids incorrectly treating delivery as occurring before liquid has reached the nozzle.

Inventors

  • 👤 Shigemasa Fujiwara
  • 👤 Shoji Uemura
  • 👤 Yasuo Sugishima

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-05 17:19
CPC Classifications
B; B67; B67D; B67D7/00; B67D7/06; B67D7/08; G; G01; G01F; G01F15/00; G01F15/06; G01F15/061; G01F15/063

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 81 words
A flow-rate measurement control device for the refuel control system, which is capable of inhibiting counting operations against the flow-rate pulses during the initial period of a refuel operation in conjunction with a specific time data (T) stored in memory (34) comprising; a refuel unit (2); a flow-rate pulse generator (27) incorporated in the refuel unit (2); the memory (34) for storing the presetable time data; and a counter for counting the flow-rate pulses generated by the flow-rate pulse generator (27).
Claim 2
Dependent Claim 81 words
A flow-rate measurement control device for the refuel control system, which is capable of inhibiting counting operations against the flow-rate pulses during the initial period of a refuel operation in conjunction with a specific time data (T) stored in memory (34) comprising; a refuel unit (2); a flow-rate pulse generator (27) incorporated in the refuel unit (2); the memory (34) for storing the presetable time data; and a counter for counting the flow-rate pulses generated by the flow-rate pulse generator (27).
Claim 3
Dependent Claim 50 words
Flow control apparatus for a liquid delivering system, in which flow is measured during liquid delivery by use of pulses generated by a pulse generator (27) characterised in that following the initiation of a liquid delivery operation the said pulses are ignored in the flow measurement for a preset period.
Claim 4
Dependent Claim 50 words
Flow control apparatus for a liquid delivering system, in which flow is measured during liquid delivery by use of pulses generated by a pulse generator (27) characterised in that following the initiation of a liquid delivery operation the said pulses are ignored in the flow measurement for a preset period.
Claim 5
Dependent Claim 16 words
Flow control apparatus according to claim 2 which 'has means for altering the said preset period.
Claim 6
Dependent Claim 40 words
Flow control apparatus according to claim 2 or claim 3 in which the said measurement of flow is carried out by data processing means (1), the said preset period being stored in a memory of the data processing means (1).
Claim 7
Dependent Claim 90 words
Flow control apparatus according to claim 4 in which the said data processing means (1) comprises a control processor (1A) and an operation processor (1B), the said preset period being stored in a memory (34) of the control processor (1A), the operation processor (1B) obtaining the value of the preset period from the control processor (1A) on initiation of a liquid delivery operation and receiving the said pulses during the liquid delivery operation, the operation processor (1B) counting said pulses received by it after the expiry of the preset period.

References Cited (Backward Citations)

US3913787A Cited
US4290538A Cited
GB2028768A Cited

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag