Abstract

Abstract A method of identifying a parameter of a model for a rate of loss of boiler efficiency due to a soot-blowing operation, in a boiler or other convection heat transfer device having a plurality of heat traps, comprising measuring a time since a last sootblowing operation in the heat trap in question, measuring an overall boiler efficiency at the beginning of soot-blowing for the heat trap in question, measuring a change in efficiency due to the sootblowing operation and calculating the parameter using an equation. According to the equation, the ratio of efficiency change over overall boiler efficiency equals the time factor since the last sootblowing operation times the parameter minus a summation of factors for each of the other heattraps and their associated sootblowing operations. A method is also disclosed for enhancing a sootblowing operation wherein, with a plurality of heat traps, sootblowing is performed in an upstream heat trap in prefer- ance to a downstream heat trap, when both heat traps are near a fouled condition which would require sootblowing. This prevents premature fouling of a downstream heat trap which has recently been cleaned by soot blown off an upstream heat trap.

Inventors

  • 👤 Donald J. Dziubakowski

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-10-31 05:07
CPC Classifications
F; F23; F23J; F23J3/00; F22; F22B; F22B37/00; F22B37/02; F22B37/56

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 209 words
A method of optimizing a sootblowing operation in a boiler having a plurality of heat traps lying in series along a gas flow path, comprising: selecting a set time (8 bi ) between sootblowing operations of each heat trap based on a fouling model for the boiler; calculating an optimum time (e o p t ) between soot- blowing operations of each heat trap based on scaling parameters and a cost factor for the sootblowing operation; obtaining a difference value between set and optimum time for each heat trap and comparing the difference value for each heat trap with a selected value which is indicative of the desirability for initiating a soot- blowing operation for each heat trap; with the difference value equaling the selected value for only one heat trap, initiating sootblowing in that one heat trap; and with the difference value approaching the selected value for more than one heat trap, delaying the initiation of sootblowing in a downstream one of the heat traps to permit the difference value to equal the selected value in an upstream one of the heat traps to initiate soot- blowing in the upstream one of the heat traps before the initiation of sootblowing in a downstream one of the heat traps.
Claim 2
Independent Claim 209 words
A method of optimizing a sootblowing operation in a boiler having a plurality of heat traps lying in series along a gas flow path, comprising: selecting a set time (8 bi ) between sootblowing operations of each heat trap based on a fouling model for the boiler; calculating an optimum time (e o p t ) between soot- blowing operations of each heat trap based on scaling parameters and a cost factor for the sootblowing operation; obtaining a difference value between set and optimum time for each heat trap and comparing the difference value for each heat trap with a selected value which is indicative of the desirability for initiating a soot- blowing operation for each heat trap; with the difference value equaling the selected value for only one heat trap, initiating sootblowing in that one heat trap; and with the difference value approaching the selected value for more than one heat trap, delaying the initiation of sootblowing in a downstream one of the heat traps to permit the difference value to equal the selected value in an upstream one of the heat traps to initiate soot- blowing in the upstream one of the heat traps before the initiation of sootblowing in a downstream one of the heat traps.
Claim 3
Dependent Claim 26 words
A method according to claim 1, including initiating sootblowing in a heat trap only when soot- blowing is not taking place in any other heat trap.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag