Coal gasification composite power generating plant

Assignee: Hitachi Ltd
•
Filing: 1984-06-08
•
Granted: —
•
Expires: 2004-06-08
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A coal gasification composite power generating plant has a coal gasification plant (60) and a composite power generating plant (61). The coal gasification plant has a low-pressure steam generator for recovering heat from the furnace wall of a pressurized fluidized bed type coal gasification furnace (3), and a high-pressure steam generator (7, 47) disposed at the outlet of the gasification furnace and adapted to recover heat from the unrefined gas coming from the gasification furnace. The composite power generating plant includes a gas turbine (17) which uses the gas generated in the gasification plant as the fuel gas, a boiler (20) for recovering heat from the exhaust gas of the gas turbine, and high-pressure and low-pressure steam turbines (42, 43) which operate with the steam generated by the boiler. The high-pressure steam generated in the high-pressure steam generator is introduced to the high-pressure steam turbine, while the steam generated in the low-pressure steam generator is introduced into the low-pressure steam turbine, thereby to effectively recover the energy.

Inventors

  • 👤 Tadao Arakawa
  • 👤 Yoshiki Noguchi
  • 👤 Yukio Hishinuma
  • 👤 Nobuo Nagasaki

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-10-29 15:13
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/06; F01K23/10; F01K23/106; F01K23/067; Y; Y02; Y02E; Y02E20/00; Y02E20/16; Y02E20/18

Claims Analysis

Total Claims: 6
Claim 1
Independent Claim 206 words
A coal gasification composite power generating plant comprising: a coal gasification plant having a coal gasification furnace of pressurized fluidized bed type, in which coal is gasified at a pressure higher than the atmospheric pressure, a first steam generator for recovering heat from the gas generated in said gasification furnace thereby to cool said gas, a second steam generator disposed at the outlet of said coal gasification furnace and adapted to recover heat from the unrefined gas coming out of said gasification furnace, and a gas refining apparatus for refining the unrefined gas which has been cooled through heat recovery by said second steam generator; and a composite power generating plant including a gas turbine which operates using the gas generated by said gasification plant as the fuel, a boiler for recovering heat wasted from said gas turbine, and high-pressure and low-pressure steam turbines which operate with the steam generated by said boiler; wherein the improvement comprises that the steam generated in said second steam generator has a pressure higher than that of the steam generated in said first steam generator, and the low-pressure steam and the high-pressure steam from said steam generators are introduced, respectively, to said low-pressure steam turbine and said high-pressure steam turbine.
Claim 2
Dependent Claim 206 words
A coal gasification composite power generating plant comprising: a coal gasification plant having a coal gasification furnace of pressurized fluidized bed type, in which coal is gasified at a pressure higher than the atmospheric pressure, a first steam generator for recovering heat from the gas generated in said gasification furnace thereby to cool said gas, a second steam generator disposed at the outlet of said coal gasification furnace and adapted to recover heat from the unrefined gas coming out of said gasification furnace, and a gas refining apparatus for refining the unrefined gas which has been cooled through heat recovery by said second steam generator; and a composite power generating plant including a gas turbine which operates using the gas generated by said gasification plant as the fuel, a boiler for recovering heat wasted from said gas turbine, and high-pressure and low-pressure steam turbines which operate with the steam generated by said boiler; wherein the improvement comprises that the steam generated in said second steam generator has a pressure higher than that of the steam generated in said first steam generator, and the low-pressure steam and the high-pressure steam from said steam generators are introduced, respectively, to said low-pressure steam turbine and said high-pressure steam turbine.
Claim 3
Dependent Claim 79 words
A coal gasification composite power generating plant according to claim 1, wherein said waste heat boiler has a low-pressure drum and a high-pressure drum, the steam generated in said low-pressure drum and the steam generated in said high-pressure drum are mixed with the steam generated in said first steam generator and the steam generated in said second steam generator, respectively, and the mixtures of the steam are introduced, respectively, to said low-pressure steam turbine and said high-pressure steam turbine.
Claim 4
Dependent Claim 96 words
A coal gasification composite power generating plant according to claim 1, characterized by further comprising a third steam generator separate from said first steam generator and adapted to recover heat from said gas generated in said furnace thereby to cool said gas, said third steam generator being adapted to generate steam of the same pressure as that produced in said second steam generator, the steam produced in said second steam generator and the steam generated in said third steam generator are mixed with each other and the mixture steam is introduced to said high-pressure steam turbine.
Claim 5
Dependent Claim 28 words
A coal gasification composite power generating plant according to claim 3, wherein said second steam generator has a steam drum which is communicated with said third steam generator.
Claim 6
Dependent Claim 28 words
A coal gasification power generating plant according to claim 3, wherein both of said second and third steam generators are through-flow type steam generators having no steam drum.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag