← Back to Patent Explorer
EP0121239A2 Expired / Lapsed EP ⏱️ 0.0 years remaining

Circuit arrangement for telecommunication installations, especially for telephone exchanges comprising information processors and devices for overload control

Assignee: Siemens AG
•
Filing: 1984-03-28
•
Granted: —
•
Expires: 2004-03-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Translated from German Zur Überlastabwehr von Steuerwerken (GP1 ... GPn) für Gruppen teilnehmerindividueller oder verbindungsindividueller Schalteinrichtungen (LTG) wird mit jeder Belegung ein Zähler (Z) weitergeschaltet (z.B. von z1 bis z10), der kontinuierlich wieder zurückgeschaltet wird, und der bei Erreichen eines Grenzwertes (z.B. bei z5) ein Überlastsignal (z.B. über 5) abgibt, weiches derjenigen Schalteinrichtung zugeleitet oder ihr in einem den Schalteinrichtungen gemeinsamen Speicher zugeordnet wird, von welcher das Belegungssignal gekommen ist, welches unmittelbar zum Erreichen des Grenzwertes im Zähler geführt hat. Das Überlastsignal wird in der Zeit zwischen Belegung und erstem Wahlkennzeichen gebildet, führt zur Aussendung eines entsprechenden Hörzeichens (Besetztton) und verhindert Aufnahme von Wahlkennzeichen. Alternativlösung: Erreicht Zähler (Z) aufgrund einer Belegung den Grenzwert (z.B. bei z5), so werden die ihr entsprechenden Informationen noch aufgenommen, aber eine nächste Belegung nicht angenommen, bis genügend Zeit für entsprechende Anzahl von Rückschalt-Zählschritten (von z10 bis z1) vergangen ist. To prevent overloads from control units (GP1 ... GPn) for groups of subscriber-specific or connection-specific switching devices (LTG), a counter (Z) is switched on with each assignment (e.g. from z1 to z10), which is continuously switched back, and which is reached when a limit value is reached (e.g. at z5) emits an overload signal (e.g. via 5), which is sent to the switching device or assigned to it in a memory common to the switching devices from which the occupancy signal came, which immediately led to the limit value being reached in the counter. The overload signal is formed in the time between occupancy and the first dialing code, leads to the transmission of a corresponding audible signal (busy tone) and prevents dialing codes from being recorded. Alternative solution: If counter (Z) reaches the limit value due to an assignment (e.g. for z5), the information corresponding to it is still recorded, but a next assignment is not accepted until there is sufficient time for the corresponding number of switch-back counting steps (from z10 to z1) has passed.

Inventors

  • 👤 Georg Dipl.-Ing. Daisenberger

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-02 16:20
CPC Classifications
H; H04; H04Q; H04Q3/00; H04Q3/42; H04Q3/54; H04Q3/545; H04Q3/54575; H04Q3/54591; H04M; H04M3/00; H04M3/22; H04M3/36; H04M3/365

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag